Forwards IE Insp Rept 50-466/79-02 on 790508-11.No Noncompliance Noted
ML19242A041
Person / Time
Site: Allens Creek File:Houston Lighting and Power Company icon.png
Issue date: 05/16/1979
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Eric Turner
HOUSTON LIGHTING & POWER CO.
Shared Package
ML19242A042 List:
References
NUDOCS 7907310119
Download: ML19242A041 (2)


See also: IR 05000466/1979002

Text

_

h/b

& ..~ 4

.*2

%,

UNITED STATES

S '.y\\ * - c l 'h

NUCLEAR REGULATORY COMMISSION

'

a

<

G3%Q'

j

REGION IV

S4[?[

611 RYAN PLAZA DRIVE sulTE 1000

C, f

AR LINGTON, TEXAS 76012

'g + . ' . . .

<

,.-

May 15, 1979

In Reply Refer To:

RIV

Docket No. 50-466/Rpt. 79-02

Houston Lighting and Power Company

'

ATTN:

Mr. E.

A. Turner, Vice President

Power Plaat Construction and

Technical Services

Post Office Box 1700

Houston, Texas

77001

Centlemen:

This refers to the inspection conducted by Messers. W. G. Huback and A. B. Beach f

our staf f during the period May 8-11, 1979, of the implementation of your quality

assurance program for construction activities related to your application for a

construction permit for Allens Creek Nuclear Generating Station, Unit No. 1, and to

the discussion with Mr. W. N. Phillips and other members of your staff at the con-

clusion of the inspection.

Areas examined during the inspection and our findings are discussed in the enclosed

inspection report. Within tkese areas, the inspection consisted of selective

examination of procedures and representative records, interviews with personnel,

and observations by the inspectors.

Within the scope of the inspection, no deviations were identified.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

fitle

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Docurent Roor.

If the report contains

any information that ycu believe to be proprietary, it is necessary that you submit

a written application to this office, within 20 days of the date of this letter,

requesting that such information be withheld from public disclosure.

The application

must include a full statement of the reasons why it is claimed that the information

is proprietary. The application should be prepared so that any proprietary

information identified is contained in an enclosure to the application, since

the application without the enclosure will also be placed in the Public Document

Roca.

If we do not hear f rca you in this regard within the specified period, the

report will be placed in the Public Locument Rcca.

,, ' lO'

.

7 907 31 oP. .,

I

.

Houston Lighting and Power Company

-2-

May 16, 1979

,

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you

.

Sincerely,

.

. C. Seidle, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspeccion Report No. 50-466/79-02