Forwards IE Insp Rept 50-302/79-15 on 790507-11 & Notice of Violation
ML19241C167
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/29/1979
From: Sutherland J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
FLORIDA POWER CORP.
Shared Package
ML19241C161 List:
References
NUDOCS 7907270402
Download: ML19241C167 (2)


See also: IR 05000302/1979015

Text

g" " tog

4

o

UNITED ST ATES

E'g ufh

NUCLEAR REGULATORY COMMISSION

  • '

^'s#J.

E

FtEGION 11

.

o,

f

101 MARIETT A sT.. N.W., sulTE 3100

\\ ' .\\

[

ATLANTA, GEORGIA 30303

  • ...

In Reply Refer To:

MAY 2 91979

RII:RWZ

50-302/79-15

Florida Power Corporation

KfTN:

W. P. Stewart, Director

Nuclear Operations

P. O. Box 14042, Mail Stop C-4

St. Petersburg, FL 33733

Gentlemen:

This refers to the inspection conducted by R. W. Zavadoski of this office on

May 7-11, 1979, of activities authorized by NRC Operating License No. DPR-72 for

the CrJstal River 3 facility, and to the discussion of our findings held with

G. P. Beatty at tle conclusion of the inspection.

The inspection was an examination of the activities conducted under your license

as they relate to radiation safety and to compliance with the Comission's rules

and regulations and the conditions of your license. The inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Two new unresolved items resulted from this inspection and are discussed in the

enclosed report. These items will be examined during subsequent inspections.

During the inspection, it was found that certain activities under year license

appear to be in noncompliance with NRC requirements. These items and references

to pertinent requirements are listed in the Notice of Violation enclosed hermith

as Appendix A.

This notice is sent to you pursuant to the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office, within 20 days of your

receipt of this notice, a written statement or eglanation in reply including:

(1) corrective steps which have been taken by you and the results achieved; (2)

corrective steps which will be taken to avoid further noncompliance; and (3) the

date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

a plication must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document. If we do not hear from you in this regard within

the spec ;fied period, the report will be placed in the Public Document Room.

O')

5

907270 W 2_

MAY % S 1979

.

.

Florida Power Corporation

-2-

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

I

f

J. T. Sutherland, Chief

Fuel "=cility and Materials

Saf .y Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-302/79-15

cc w/ encl:

G. P. Beatty, Jr.

Plant Superintendent

P. O. Box 1228

Crystal River, FL 32629

4 j (,

($ N I