g" " tog
4
o
UNITED ST ATES
E'g ufh
NUCLEAR REGULATORY COMMISSION
- '
^'s#J.
E
FtEGION 11
.
o,
f
101 MARIETT A sT.. N.W., sulTE 3100
\\ ' .\\
[
ATLANTA, GEORGIA 30303
- ...
In Reply Refer To:
MAY 2 91979
RII:RWZ
50-302/79-15
Florida Power Corporation
KfTN:
W. P. Stewart, Director
Nuclear Operations
P. O. Box 14042, Mail Stop C-4
St. Petersburg, FL 33733
Gentlemen:
This refers to the inspection conducted by R. W. Zavadoski of this office on
May 7-11, 1979, of activities authorized by NRC Operating License No. DPR-72 for
the CrJstal River 3 facility, and to the discussion of our findings held with
G. P. Beatty at tle conclusion of the inspection.
The inspection was an examination of the activities conducted under your license
as they relate to radiation safety and to compliance with the Comission's rules
and regulations and the conditions of your license. The inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Two new unresolved items resulted from this inspection and are discussed in the
enclosed report. These items will be examined during subsequent inspections.
During the inspection, it was found that certain activities under year license
appear to be in noncompliance with NRC requirements. These items and references
to pertinent requirements are listed in the Notice of Violation enclosed hermith
as Appendix A.
This notice is sent to you pursuant to the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this office, within 20 days of your
receipt of this notice, a written statement or eglanation in reply including:
(1) corrective steps which have been taken by you and the results achieved; (2)
corrective steps which will be taken to avoid further noncompliance; and (3) the
date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
a plication must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document. If we do not hear from you in this regard within
the spec ;fied period, the report will be placed in the Public Document Room.
O')
5
907270 W 2_
MAY % S 1979
.
.
Florida Power Corporation
-2-
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
I
f
J. T. Sutherland, Chief
Fuel "=cility and Materials
Saf .y Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report No. 50-302/79-15
cc w/ encl:
G. P. Beatty, Jr.
Plant Superintendent
P. O. Box 1228
Crystal River, FL 32629