ML19241B878

From kanterella
Jump to navigation Jump to search
Ack Receipt of Responding to NRC & Notice of Violation.Requests Addl Info Re What Date Leak Test Performed,Results of Test & What Steps Taken to Ensure Future Leak Tests Performed at 6-month Intervals
ML19241B878
Person / Time
Issue date: 04/09/1979
From: Brown G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Mcintyre B
LAWTON, OK
Shared Package
ML19241B851 List:
References
NUDOCS 7907250223
Download: ML19241B878 (1)


Text

[pa a *c.r,,,D UNITE D STATES c

o NUCLEAR HEGULATORY COMMISSION O

-?

I 'n REGION IV

.jh

, /

j G11 RYAN PLAZA DRIVE, SUITE 1000

  • g !

AR LINGTON, TE X AS 76011 c,

f s

e April 9,1979 License tio. 35-17596-01 Lawton Wastewater Treatment Plant ATTil:

Bill McIntyre Route 2, Box 69 Lawton, Oklahoma 73501 Gentlemen :

Thank you for your letter of March 19, 1979, in response to our letter dated February 27, 1979, and the actached Notice of Violation. As a result of our review, we find that additional information, as discussed with your Mr. McIntyre during a telephone call on April 2,1979, is needed.

Specifically, on what date the required 1 !ak test was performed, the results of that leak test, and what steps hav. been taken to insure that future leak tests are perfomed at intervels not to exceed six months.

You should submit this information within ten (10) days of your receipt of this letter so that we can continue our review of this matter.

Sincerely, d

L6(C len D. Brown, Chief Fuel Facility and Material Safety Branch CERTIFIED MAIL - RETURN RECEIPT REQUESTED

/