ML19241B876
Jump to navigation
Jump to search
| ML19241B876 | |
| Person / Time | |
|---|---|
| Issue date: | 02/27/1979 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | |
| Shared Package | |
| ML19241B851 | List: |
| References | |
| NUDOCS 7907250215 | |
| Download: ML19241B876 (1) | |
Text
License fio. 35-17596-01 flotice of Violation Based on the results of the fiRC inspection conducted on February 9,1979, certain activities appear to be in noncompliance with fiRC regulations as indicated below:
Contrary to 10 CFR 31.5(c)(2), the nominal 50 millicurie cesium-137 source Kay Ray flodel 7062, used to measure flow on a conveyor belt, was not always tested for leakage at intervals not to exceed six months during the period June 30, 1977, to February 9, 1979.
This is an infraction.
,M, '5 O M h}