ML19241B756

From kanterella
Jump to navigation Jump to search
Forwards LER 79-029/03X-1
Date released: 09/12/2019 Download: ML19241B756


LER 79-029/03X-1 on 790602:during Insp Per IE Bulletin 79-07,snubbers in Core to Spray Vessel,Recirculation Pump Suction & Main Steam Line Discovered Inoperable.Caused by Low Fluid Level.Snubbers Aligned & Clamps Tightened
ML19241B772
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 07/18/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19241B772 (2)
Forwards LER 79-029/03X-1
ML19241B755
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 07/18/1979
From: Banks H
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19241B755 (1)