Responds to IE Bulletin 78-12B.Generic Rept Submitted by Chicago Bridge & Iron Co Adequately Represents Data for Facility Reactor Pressure vessels.C-E Will Submit Generic Rept by Midsummer 1979 & Request 30-day Review Period
ML19241B484
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 05/29/1979
From: Mcduffie M
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 7907180153
Download: ML19241B484 (1)


Text

  • s

'Tq P(A bk h' 7 C.

O RE Carolina Power & Ldh,yary%

i

.u s 'e i May 29, 1979 Mr. James P. O'Reilly Region II U. S. Nuclear Regulatory Comission 101 Marietta Street, N. W.

Atlanta, Georgia 30303 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NOS. 1, 2, 3, and 4 DOCKET NOS. 50-400, 50-401, 50-402, and 50-403 IE BULLETIN 78-12B

Dear Mr. O'Reilly:

In response to your letter dated March 19, 1979, Chicago Bridge & Iron Company ruimitted, on April 24, 1979, a generic report on the veld materials used to fabricate the reactor pressure vessels for the Shearon Harris Nuclear Power Piant (SHNPP) Units 1 and 2.

Carolina Power & Light Company and Westinghouse Electric Corporation, our supplier, have reviewed this report and are satisfied that it adequately represents data for the reactor pressure vessels for SHNPP Units 1 and 2.

Carolina Power & Light Company has been informed by our supplier that the generic report for the reactor pressure vessels for SHNPP Units 3 and 4, manufactured by Combustion Engineering, vill not be submitted to the NRC until mid-summer 1979.

Carolina Power & Light Company request <., a 30 day review period, subsequent to the submittal of the generic report by Combustion Engineering, before responding to the NRC regarding the pertinence of t' e report to our vessels.

Yours very truly, h a kg M. A. McDuffie Senior Vice President Engineering & Construction MAM/gts cc:

U. S. Nuclear Regulatory Comission Office of Inspection and Enforcement Division of Reactor Construction Inspection Washington, D. C.

20555 517 190 7907180Is3 411 Fayettevme St eet

  • P O Bon 1551
  • Ra'e a" N C 2 7f>C2 bIfQl w rr.a=r-v m x

--m

(,alMOLAL COPY n.

. - _