Forwards IE Insp Repts 50-445/79-06 & 50-446/79-06 on 790301-30 & Notice of Violation
ML19241B088
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 05/10/1979
From: Seiale W, Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML19241B089 List:
References
NUDOCS 7907110671
Download: ML19241B088 (2)


See also: IR 05000445/1979006

Text

7 J~c-

.

pa R!cg

UNITED STATES

y["

o,

NUCLEAR REGULATORY COMMl3/!ON

  • 1

REGION IV

5

.$

611 RYAN PLAZA DRIVE, SUITE 1000

o

'8

ARLINGTON, TEX AS 7601'

%-/

May 10, 1979

In Reply Refer To:

RIV

Docket No. 50-445/Rpt. 79-06

50-446/Rpt. 79-06

.

Texas Utilities Generating Company

ATTN: Mr. R. J. Gary, Executive Vice

President and General Manager

2001 Bryan Tower

Dallas, Texas

75201

Gentlemen:

This refers to the inspection by Messrs. R. G. Taylor and L. E. Martin of

our staff during the period March 1-30, 1979, of activities authorized

by NRC Construction Permits No. CPPR-126 and 127 for the Comanche Peak

facility, Units No.1 and 2, and to the discussion of our findings with

Mr. R. G. Tolson and other members of your staff at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection con-

sisted of selective examination of procedures and representative records,

interviews with personnel, and observations by the inspectors.

During the inspection, it was found that certain activities under your

license appear to be in noncompliance with Appendix B to 10 CFR 50 of

the NRC Regulations, " Quality Assurance Criteria for Nuclear Power

Pl ants . " The item of noncompliance and references to the pertinent

requirements are identified in the enclosed Notice of Violation.

This notice is sent to you pursuant to the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regul ations .

Section 2.201 requires you to submit to this <>ffice, within

30 days of your receipt of this notice, a written statement or expianation

in reply including:

(1) corrective steps which have been taken by you,

and the results achieved; (2) corrective steps which will be taken to

avoid further noncompliance; and (3) the date when full compliance will

be achieved. We have also examined actions you have taken with regard to

previously identified inspection findings.

The status of these items is

identified in paragraph 2 of the enclosed report.

.g

- r, i

>

790711067/l

'

.

Texas Utilities Generating

Company

_g_

May 10,1979

One new unresolved item is identified in paragraph 8 of the enclosed

report.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

,

Room.

If the report contains any information that you believe to be

proprietary, it is necessary that you submit a written applic, tion to this

office, within 20 days of the date of this letter, requesting that such

information be withheld from public disclosure. The application must

include a full statement of the reasons why it is claimed that the

information is proprietary.

Tne application should be prepared so that

any proprietary inDrmation identified is contained in an enclosure to

the application, since the application without the enclosure will also be

placed in the Public Document Room.

If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Document Room.

Should you have any questions concerning this inspection, we will be

pleased to discuss them with you.

Sincerely,

S

m

,

W. C. Sei

Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

IE Inspection Report No. 50-445/79-06

50-446/79-06

cc: w/enclosu. es

Texas Utilities Generating Company

ATTN: Mr. H. C. Schmidt, Project Manager

2001 Bryan Tower

Dallas, Texas

75201