f* * E %q'o,
UNITED STATES
'
!'
fg 'n
NUCLEAR REGULATORY COMMISSION
- .,f
i
REGION 11
5
-
g
8
101 MARIETT A sT., N.W., sulTE 31 A
o, p
8
ATL ANTA, GEORGI A 30303
g '.%:
o
. ...
In Reply Refer To:
MAY 2 3 M
RII:JJL
50-491/79-09
50-L92/79-09
50-493/79-09
Duke Power Company
Attn:
L. C. Dail, Vice President
Design Engineering
Post Office Box 33189
Charlotte, North Carolina 28242
Gentlemen:
This refers to the inspection conducted by J. J. Lenahan of this office
on May 8-10, 1979 of activities authorized by NRC Construction Permit
Nos. CPPR-167, CPPR-168 and CPPR-169 for the Cherckee Nuclear Station
facility, Units 1, 2 and 3, and to the discussion of our findings held
with C. B. Aycock at the conclusion of the inspectien.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspcctor.
Within the scope of this inspection, no items of noncompliance were
disclosed.
We have examined actions you have taken with regard to previously identi-
fied enforcement matters and unresolved items. The status of these
iten.s is discussed in the enclosed report.
One new unresolved item resulted from this inspection and is discussed
in the enclosed report.
This item will be examined during subsequent
inspections.
In accordance with 3-ction 2.790 of the NRC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this letter
and the enclosed in::pection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you (or
your contractor) besieve to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is
3jg
}Ck7907090 h 7 6
d
MAY 2 31979
.
Duke Power Company
-2-
claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained
in a separate part of the document.
If we do not hear from you in this
regard within the specified period, the report will be placed in the
Public Document Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
'
f
e
Charles E. Murphy, Chief
Reactor Construction and
Engineering Support Branch
Enclosures:
Inspection Report Nos. 50-491/79-09,
50-492/79-09 and 50-493/79-09
cc w/ enclosures:
J. T. Moore, Project Manager
Post Office Box 422
.
Caffney, South Carolina 29340