ML19241A801
| ML19241A801 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 05/24/1979 |
| From: | Crews E SOUTH CAROLINA ELECTRIC & GAS CO. |
| To: | Oeilly J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML19241A802 | List: |
| References | |
| NUDOCS 7907090406 | |
| Download: ML19241A801 (2) | |
Text
_
hl'/
1
" HPANY SOUTH CAROLINA ELECTRIC & C s COLUMBIA, SOUTH CAROLINA 292 88 E.H. Ca tw s. J a.
wes-Pes sio..,..e r..ov. Esseems May 24, 1979 m
c...
c...
y C
aC r-
- tr,
>Z 22 w
-4 0 c:-
. "O Mr. James P. O'Reilly, Director-
- p United States Nuclear Regulatory Commission m
T Region II, Suite 1217 230 Peachtree Street, N. W.
.c Atlanta, Georgia 30303
Subject:
Virgil C. Su=mer Nuclear Station NRC Bulletins 78-12 and 78-12A/12B
~
Re:
RII:JPO 50-395
Dear Mr. O'Reilly:
Based upon the Westinghouse (V) technical evaluation of information contained in a generic report prepared by Chicago Bridge & Iron Company (CB&I) which addresses the requirements of the above referenced bulletins, W has concluded that weld material data and other required information pertaining to the Virgil C. Summer (CGE) reactor vessel are included in the This repr,rt was submitted earlier to the Nuclear Regulatory CB&I report.
Commission (NRC) and is evidenced by CB&I's transmittal letter enclosed as Attachment A.
Additionally, a copy of CB&I's letter to W is enclosed as Attachment B, which provides further confirmation that the CB&I generic report includes records pertaining to the Virgil C. Summer (CGE) reactor vessel.
Shouldyouhavefurtherques*onyorrequireadditionalinformation concerning this matter, please c tac us.
V ry,tr ly yours, a
4 a w>.
OWDJr:EHCJr:msd g
CC: Messrs.
V. C. Su=mer 2
A Q
E. H. Crews, Jr.
bh b)'
D. A. Nauman
/
M. B. Whitaker, Jr.
h!
7 907 0 9 'IOg H. T. Babb NPCF/Dixon
[
(' Ul T. B. Conner Tile 310 171 7gIsa OmCI AL COPY
7.
p 4TTACHMENT A 3
[
SMD Fairda%, north Haucion road Chicago Drldge & Iron Company p o box 43.966 Houston. Texas 77040 teleohone 713. 405 7581 April 24, 1979 Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Attention: Mr. G. W. Reinmuth RE: NRC BULLETINS 78-12 & 78-12A -
Gentlemen:
In accordance with the above listed Bulletins and requirements from Westinghouse and General Electric, enclosed is one copy of our report.
This report includes informetion from all completed Reactor Vessels constructed by Chicago Bridge & Iron Co.
Very truly yo'urs, CH AGO BRIDGE & IRON CO.
)
'7 Ralph E. Kelley, M ager COA services Houston Operations REK:mks 4
& __~
Enclosure dif
~
O 3
0 1/2
.