Text
d,
'TF/2&
. .
SENT8AbEILES=
m aic
UNiiED STATES
Jh
NUCLEAR REGULATORY COMMISSION
ff
REGION lH
e g
p,
.
.
F
va
GL E N E L LYN, IL LINOIS 60137
% '.b f
..*
JtJN 6
1979
Docket No. 50-329
Docket No. 50-330
-
Consumers Power Company
ATTN:
?! r . Stephen 11. llowell
Vice President
1945 West Parnall Road
Jackson, ?!I
49201
Centlemen:
This refers to the inspection conducted by tiessrs. E. J. Gallagher
and E. W. K. Lee of this office on riay 14-17, 1979, of ac ivities at
the t!idland Nuclear Power Plant construction site authorized by NRC
Construction Permits No. CPPR-81 and No. CPPR-82 and to the discussion
of our findings with Messrs. T. Cooke and D. Miller, others of your
staff, and others of the tiidland site staff at the conclusion of the
inspection.
The enclosed copy of o'ir inspection report identifies areas exaained
during the inspection.
Within these areas, the inspection consisted
of a selective examination of procedures and representative records,
observations, and interviews with personnel
During this inspection, certain of your activities appeared to be in
noncompliance with NRC requirements, as described in the enclosed
Appendix A.
This notice is sent to you pursuant to the provisions of Section
2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
Federal Regulations.
Section 2.201 requires you to submit to this
office within thirty days of your receipt of this notice a written
statement or explanation in reply, including for each item of noncom-
pliance: (1) corrective action taken and the results achieve 1; (2)
correct ive action to be taken to avoid further noncompliance; and
(3) the date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter,
the enclosures, and your response to this letter will be
li aced in
the NRC's Public Document Room, except as follows.
If the enclosures
l'
440
033
0)
20080sog g
.
. .
YEt10W P' i r^' ,
.
.
JUN6
1979
Consumers Power Company"
-2-
contain infccmation that you or your contractors believe to ne
proprietary, you must apply in writing to this office, within twenty
days of your receipt of this letter, to withhold such information
from public discl,sure. The application must include a full state-
.
ment of the reasons for which the information is considered proprietary,
and should be prepared so that proprietary information identified in
the application is contained in an enclosure to the application.
We will gladly discuss any questions you have concerning this
inspection.
Sincerely,
G. Fiorelli, Chief
Reactor Construction and
Engineering Support Branch
Enclosures:
1.
Appendix A, Notice
of Violation
2.
IE Inspection Reports
No. 50-329/79-10 and
No. 50-330/79-10
cc w/encls:
Central Files
Reproduction Unit NRC 20b
Local PDR
'
Ronald Calien, Michigan Public
Service Commission
Dr. Wayne E. North
'
'
Myron M. Cherry, Chicago
'
,
.
.
440
034
RIII
RII'
R1II
RII~
RIII
RIII
-'
C Y-
f
/yl1;G/
Gallagher/sr
ad
Danielson
Fiore11i
Cook';
Vandel
h10
uil
'//7n
ee
5/31/79
/
'
,
5
.