Forwards IE Insp Repts 50-329/79-10 & 50-330/79-10 on 790514-17 & Notice of Violation
ML19225D039
Person / Time
Site: Midland
Issue date: 06/06/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML19225D040 List:
References
NUDOCS 7908030623
Download: ML19225D039 (2)


See also: IR 05000329/1979010

Text

d,

'TF/2&

. .

SENT8AbEILES=

m aic

UNiiED STATES

Jh

NUCLEAR REGULATORY COMMISSION

ff

REGION lH

e g

p,

.

799 RoOSEVE LT RO AD

.

F

va

GL E N E L LYN, IL LINOIS 60137

% '.b f

..*

JtJN 6

1979

Docket No. 50-329

Docket No. 50-330

-

Consumers Power Company

ATTN:

?! r . Stephen 11. llowell

Vice President

1945 West Parnall Road

Jackson, ?!I

49201

Centlemen:

This refers to the inspection conducted by tiessrs. E. J. Gallagher

and E. W. K. Lee of this office on riay 14-17, 1979, of ac ivities at

the t!idland Nuclear Power Plant construction site authorized by NRC

Construction Permits No. CPPR-81 and No. CPPR-82 and to the discussion

of our findings with Messrs. T. Cooke and D. Miller, others of your

staff, and others of the tiidland site staff at the conclusion of the

inspection.

The enclosed copy of o'ir inspection report identifies areas exaained

during the inspection.

Within these areas, the inspection consisted

of a selective examination of procedures and representative records,

observations, and interviews with personnel

During this inspection, certain of your activities appeared to be in

noncompliance with NRC requirements, as described in the enclosed

Appendix A.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations.

Section 2.201 requires you to submit to this

office within thirty days of your receipt of this notice a written

statement or explanation in reply, including for each item of noncom-

pliance: (1) corrective action taken and the results achieve 1; (2)

correct ive action to be taken to avoid further noncompliance; and

(3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter,

the enclosures, and your response to this letter will be

li aced in

the NRC's Public Document Room, except as follows.

If the enclosures

l'

440

033

0)

20080sog g

.

. .

YEt10W P' i r^' ,

.

.

JUN6

1979

Consumers Power Company"

-2-

contain infccmation that you or your contractors believe to ne

proprietary, you must apply in writing to this office, within twenty

days of your receipt of this letter, to withhold such information

from public discl,sure. The application must include a full state-

.

ment of the reasons for which the information is considered proprietary,

and should be prepared so that proprietary information identified in

the application is contained in an enclosure to the application.

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

G. Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Reports

No. 50-329/79-10 and

No. 50-330/79-10

cc w/encls:

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

'

Ronald Calien, Michigan Public

Service Commission

Dr. Wayne E. North

'

'

Myron M. Cherry, Chicago

'

,

.

.

440

034

RIII

RII'

R1II

RII~

RIII

RIII

-'

C Y-

f

/yl1;G/

Gallagher/sr

ad

Danielson

Fiore11i

Cook';

Vandel

h10

uil

'//7n

ee

5/31/79

/

'

,

5

.