Forwards IE Insp Rept 50-295/79-12 on 790611 & 13.No Noncompliance Noted
ML19225D017
Person / Time
Site: Zion File:ZionSolutions icon.png
Issue date: 06/27/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
Shared Package
ML19225D018 List:
References
NUDOCS 7908030582
Download: ML19225D017 (2)


See also: IR 05000295/1979012

Text

(* M auq'o

s

UNITED STATES

g

p

,

y};,V.g g

NUCLEAR REGULATORY COMMISSION

,

k' 'h

-

c

REGION 111

!

799 ROOSEVE LT RO AD

'

o,

'NJ

e

GLEN ELLYN ILLINOIS 60137

  • ....

JUN 2 71979

Docket No. 50-295

Commonwealth Edison Company

ATTN:

Mr. Byron Lee, Jr.

Vice President

P. O. Box 767

Chicago, IL 60690

Gentlemen:

This refers to the inspection conducted by Mr. J. J. Harrison of this

office on June 11, 1979, of activities at Zion Nuclear Generating Station,

Unit 1, authorized by h7C Operating License No. DPR-48 and to the discussion

of our findings with Mr. E. Potter and Mr. R. Shannon and others of your

staff at the conclusion of the inspection.

In addition, a meeting was

conducted at your Maywood offices on June 13, 1E79, to further discuss

the inspection results with Mr. R. J. Tamminga, Mr. W. Benjamin and

others of your staff.

The enclosed copy of our inspection report identifies areas examined

during the inspection.

Within these areas, the inspection consisted of a

selective examination of procedures and representative records, observations,

and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you or

your contractors believe to be proprietary, you must apply in writing to

this office, within twenty days of your receipt of this letter, to withhold

such information from public disclosure.

The application must include a

full statement of the reasons for which the information is considered

proprietary, and should be prepared so that proprietary information

identified in the application is contained in an enclosure to the

application.

m

@,

7 9 08 0 30 5 f'l

440

128

B

Commonwealth Edison Company

-2-

JUN 2 71979

+

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

/

%

-l L

W

G. Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection

Report No. 50-295/79-12

cc w/encls:

N. Wandke, Plant

Superintendent

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Mr. Dean Hansell, Office of

Assistant Attorney General

440

129