ML19225D017
| ML19225D017 | |
| Person / Time | |
|---|---|
| Site: | Zion File:ZionSolutions icon.png |
| Issue date: | 06/27/1979 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Brian Lee COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML19225D018 | List: |
| References | |
| NUDOCS 7908030582 | |
| Download: ML19225D017 (2) | |
See also: IR 05000295/1979012
Text
(* M auq'o
s
UNITED STATES
g
p
,
y};,V.g g
NUCLEAR REGULATORY COMMISSION
,
k' 'h
-
c
REGION 111
!
'
o,
'NJ
e
GLEN ELLYN ILLINOIS 60137
- ....
JUN 2 71979
Docket No. 50-295
Commonwealth Edison Company
ATTN:
Mr. Byron Lee, Jr.
Vice President
P. O. Box 767
Chicago, IL 60690
Gentlemen:
This refers to the inspection conducted by Mr. J. J. Harrison of this
office on June 11, 1979, of activities at Zion Nuclear Generating Station,
Unit 1, authorized by h7C Operating License No. DPR-48 and to the discussion
of our findings with Mr. E. Potter and Mr. R. Shannon and others of your
staff at the conclusion of the inspection.
In addition, a meeting was
conducted at your Maywood offices on June 13, 1E79, to further discuss
the inspection results with Mr. R. J. Tamminga, Mr. W. Benjamin and
others of your staff.
The enclosed copy of our inspection report identifies areas examined
during the inspection.
Within these areas, the inspection consisted of a
selective examination of procedures and representative records, observations,
and interviews with personnel.
No items of noncompliance with NRC requirements were identified during
the course of this inspection.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room, except as follows.
If this report contains information that you or
your contractors believe to be proprietary, you must apply in writing to
this office, within twenty days of your receipt of this letter, to withhold
such information from public disclosure.
The application must include a
full statement of the reasons for which the information is considered
proprietary, and should be prepared so that proprietary information
identified in the application is contained in an enclosure to the
application.
m
@,
7 9 08 0 30 5 f'l
440
128
B
Commonwealth Edison Company
-2-
JUN 2 71979
+
We will gladly discuss any questions you have concerning this
inspection.
Sincerely,
/
%
-l L
W
G. Fiorelli, Chief
Reactor Construction and
Engineering Support Branch
Enclosure:
IE Inspection
Report No. 50-295/79-12
cc w/encls:
N. Wandke, Plant
Superintendent
Central Files
Reproduction Unit NRC 20b
Local PDR
Mr. Dean Hansell, Office of
Assistant Attorney General
440
129