ML19225C684

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-327/79-26 & 50-328/79-13 on 790425-27.No Noncompliance Noted
ML19225C684
Person / Time
Site: Sequoyah  
Issue date: 05/16/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19225C686 List:
References
NUDOCS 7908020185
Download: ML19225C684 (2)


See also: IR 05000327/1979026

Text

.

.

.

-

A.

_ . . . . - _ ~ _

.

_

-

Rk

'

UNITED STATES

  1. "8%q\\

NUCLEAR REGULA IORY COMMISSION

+

$

s 3e,

g

REQlONil

A 7

2

101 M ARIETT A STREET.N.VV.

I

ATLANTA. oEORotA 303o3

o

' ' . . . . . '

JAY 161979

QAM

In Reply Refer To:

RII TDG

50-327/79-26

50-328/79-13

nennessee Valley Authority

AITN:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

This refers to the inspection conducted by T. D. Gibbons of this of fice on

April 25-27, 1979, of activities authorized by NRC Construction Permit Nos.

CPPR-72 and CPPR-73 for the Sequoyah Nuclear Plant Units 1 and 2 facility,

and u the discussion of our findings held with G. G. Stack at the conclusion

of the inspection.

Areas examired during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scopa of this inspection, no items of noncompliance were disclosed.

We have examined actions yc s have taken with regard to previously reported

unresolved items. The status of these items is discussed in the enclosed

report.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Ccde of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any informatica that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within

20 days to this office to withhold such infortnation from public disclosure.

Any such application must include a full statement of the reasons on the

basis of which it is claimed that the information is proprietary, and should

be prepared so that proprietary information identified in the application is

contained in a separate part of the document. If we do not hear from you in

this regard within the specified period, the report will be placed an the

Public Document Room.

/\\

436

341

M

7968020Wb

_ .t .

_.

___ ._

. .

.

MAY 161979

Tennessee Valley Authority

-2-

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

't ,,

Charles E.

urpg, Chief

,

Reactor Construction and Engineering

Support Branch

Fr.losure:

12 pection Report Nos. 50-327'79-26

and 50-328/79-13

cc w/ enc 1:

J. E. Gilleland

Assistant Manager of Power

500C Chestnut Street Tower II

Chattanooga, TN 37401

G. G. Stack, Project Manager

P. O. Box 2000

Daisy, TN 37319

J. M. Ballentine

Plant Superintendent

P. O. Box 2000

Daisy, TN 37319

J. F. Cox

400 Comerce Street

W10C131 C

Knoxville, TN 37902

D. L. Lambert, Project Engineer

400 Chestnut Street Tower II

Chattanooga, TN 37401

b

9