ML19225C684
| ML19225C684 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 05/16/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML19225C686 | List: |
| References | |
| NUDOCS 7908020185 | |
| Download: ML19225C684 (2) | |
See also: IR 05000327/1979026
Text
.
.
.
-
A.
_ . . . . - _ ~ _
.
_
-
Rk
'
UNITED STATES
- "8%q\\
NUCLEAR REGULA IORY COMMISSION
+
$
s 3e,
g
REQlONil
- A 7
2
101 M ARIETT A STREET.N.VV.
I
ATLANTA. oEORotA 303o3
o
' ' . . . . . '
JAY 161979
QAM
In Reply Refer To:
RII TDG
50-327/79-26
50-328/79-13
nennessee Valley Authority
AITN:
H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, TN 37401
Gentlemen:
This refers to the inspection conducted by T. D. Gibbons of this of fice on
April 25-27, 1979, of activities authorized by NRC Construction Permit Nos.
CPPR-72 and CPPR-73 for the Sequoyah Nuclear Plant Units 1 and 2 facility,
and u the discussion of our findings held with G. G. Stack at the conclusion
of the inspection.
Areas examired during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspector.
Within the scopa of this inspection, no items of noncompliance were disclosed.
We have examined actions yc s have taken with regard to previously reported
unresolved items. The status of these items is discussed in the enclosed
report.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Ccde of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any informatica that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within
20 days to this office to withhold such infortnation from public disclosure.
Any such application must include a full statement of the reasons on the
basis of which it is claimed that the information is proprietary, and should
be prepared so that proprietary information identified in the application is
contained in a separate part of the document. If we do not hear from you in
this regard within the specified period, the report will be placed an the
Public Document Room.
/\\
436
341
M
7968020Wb
_ .t .
_.
___ ._
. .
.
MAY 161979
Tennessee Valley Authority
-2-
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
't ,,
Charles E.
urpg, Chief
,
Reactor Construction and Engineering
Support Branch
Fr.losure:
12 pection Report Nos. 50-327'79-26
and 50-328/79-13
cc w/ enc 1:
J. E. Gilleland
Assistant Manager of Power
500C Chestnut Street Tower II
Chattanooga, TN 37401
G. G. Stack, Project Manager
P. O. Box 2000
Daisy, TN 37319
J. M. Ballentine
Plant Superintendent
P. O. Box 2000
Daisy, TN 37319
J. F. Cox
400 Comerce Street
W10C131 C
Knoxville, TN 37902
D. L. Lambert, Project Engineer
400 Chestnut Street Tower II
Chattanooga, TN 37401
b