{{#Wiki_filter:~__ - a arc UNITED STATES f. 3 j NUCLEAR REGULATORY COMMISSION y .m REGION 11 7 % '.h[[[E % 101 M ARIETT A sT., N W., sulTE 310o S, ATLANT A GEORGI A 3o303 V ,
- ...
MAY 2 41979 In Reply Refer To: RII: JAM 50-302/79-4 Florida Power Corporation Atto: W. P. Stewart, Director Power Production Post Office Box 14042, Mail Stop C-4 St. Petersburg, Florida 33733 Gentlemen: This refers to the inspection conducted by J. A. Mcdonald, Jr. and others of this office on February 12-16, 1979 of activities authorized by NRC License No. DPR-72 for the Crystal River f acility, Unit 3, and to the discussion of our findings held with G. P. Beatty, Plant Manager and Q. B. Dubois, Quality Programs Dir2ctor, at the conclusion of the inspection. Areas examined during the inspection and our findings are discussed in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspectors. We have examined actions you have taken with regard to previously identified inspection findings. These are discussed in the enclosed inspection report. Two new unresolved items resulted from this inspection and are discussed in the enclosed report. These items will be examined during subsequent inspections. During this inspection it was found that certala activities under your license appear to be in noncompliance with NRC requirements. These items and references to pertinent requirements are listed in the Notice of V.olation enclosed herewith as Appendix A. This notice is sent to you pursuant to the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations. Section 2.201 requires you to submit to this office, within 20 days of yot.r receipt of this notice, a written statement or explanation in reply including: (1) corrective steps which have been taken by you and t'ue results achieved; (2) corrective steps which will be taken to avoid further noncompliance; and (3) the date when full compliance will be achievei. With regard to Item E of Appendix A, corrective actions to prevent recurrence of the record submittal plan portion of the item vere completed prior to conclusion of this inspection; therefore, a reply is not requested for this portion of ' the item. f) A f~ > (M ' 749801'G 3 ItU/ LL
. . Florida Power Corporation -2- MAY a 41979 In addition to the need for corrective action regarding these cpecific items of noncompliance, we are concerned about the implementation of Conse- your quality assurance program that permitted their occurrence. quently, in your rep 3y, you should describe in particular those actions taken or planned to improve the effectiveness of your quality assurance It is also requested that your reply include QA program improve- program. ments that cover the eleven items which require management attention, as discussed in the exit interview. In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room. If this report contains any information that you (or your contractor) believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure. Any such application must include a full state- ment of the reasons on the basis of which it is claimed that the informa- tion is proprietary, and should be prepared so that proprietary information of the identified in the application is contained in a separate part document. If we do not hear from you in this regard within the specified period, the report vill be placed in the Public Document Room. Should you have any questions corcerning this letter, we will be glad to discuss them with you. Sincerely, h@ wames P. O'Reilly D ector Enclosures: 1. Appendix A, Notice of Violas 2. Inspection Report No. 50-302/79-04 cc w/ enclosures: G. P. Beatty, Jr. Nuclear Plant Superintendent Post Office Box 1228 Crystal River, Florida 32629 ( Q') AY }}