Forwards IE Insp Rept 50-458/79-01 on 790529-0601.No Noncompliance Noted
ML19225C552
Person / Time
Site: River Bend Entergy icon.png
Issue date: 06/15/1979
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Weigand J
GULF STATES UTILITIES CO.
Shared Package
ML19225C553 List:
References
NUDOCS 7908010036
Download: ML19225C552 (2)


See also: IR 05000458/1979001

Text

I' T Cs

'

  1. p arcq

'o

UNITED STATES

E y , c. c y n

NUCLEAR REGULATORY COMMISSION

g$dh[/.$

$4

'"

REGION IV

f

611 RYAN PLAZA DRIVE, SUITE 1000

\\ ' .N / [

ARLINGTON, TEX AS 76012

  • ..<

June 15, 1979

In Reply Refer To:

RIV

Docket No. 50-458/Rpt. 79-01

Gulf States Utilities

ATTN:

Dr. J. G. Weigand, General Manager

Nuclear Projects

Post Office Box 2951

Beaumont, Texas

77704

Gentlemen:

This refers to the inspection conducted by Fk. C. R. Oberg of our staff during

the period May 29 - June 1,1979, of activities authorized by NRC Construction

Permit No. CPPR-145 for River Bend, Unit No. 1, and to the discussion of our

findings with Mr. J. E. Winberly and other members of your staff at the con-

clusion of the inspection.

Arras examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scope of the inspection, no items of noncompliance were identified.

We have also exaained actions you have taken with regard to previously identified

inspection findings. The status cf these items is identified in paragraph 2 of

the encicsed report.

One new unresolved item is identified in paragraph 4 of the enclosed report.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Puolic Document Room.

If the

report contains any information that you believe to be proprietary, it is

necessary that you submit a written application to this office, wi-hin 20 days

of the date of this letter, requesting that such information be withheld from

public disclosure.

The application must include a full statement of the reasons

why it is claimed that the information is proprietary.

The application should

'v e prepated so that any proprietary information identified is contained in an

enclosure to the application, since the application without the enclosure will

also be placed in the Public Document Room.

If we do not hear from you in this

regard within the specified period, the report will be placed in the Public

Document Room,

n'

443

305

10

7908010036

.

.

Gulf States Utilities

-2-

June 15, 1979

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

/

,

bc

,

W. C. Seidl

Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

1E Inspection Report No. 50-458/79-01