ML19225C549
| ML19225C549 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 07/06/1979 |
| From: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Stewart W FLORIDA POWER CORP. |
| References | |
| NUDOCS 7908010028 | |
| Download: ML19225C549 (2) | |
Text
/
o, NUCLE AR REGUL ATORY COMMISSION
!%$ ! J' J '
'n E
REGION 11 f
o, r.
[
101 MARIE T T A si. N W. sulT E 3100 s
AT L ANT A. GE ORGI A 30303 g
o e
JUL C 1979 In Reply Refer To:
RII:JPO 50-302 Florida Powe; Corporation Attn:
W.
P. Stewart, Manager huclear Operations P.
O.
Box 14042, Mail Stop C-4 St. Petersburg, Florida 33733 Gentlemen:
This Information Notice is provided as an early notification of a possibly significant matter.
It is expected that recipients will review the infor-mation for possible applicability to their facilities.
No specific action or response is requested at this time.
If you have questions regarding this matter, please contact the Director of the appropriate NRC Regional Office.
L./
h James P. O'Reilly Director
Enclosure:
1E Information Notice No. 79-18 44/
154 7908010P'}
JUL 6 1979 Florida Power Corporation,
cc w/ encl:
G. P. Beatty, Jr.
Nuclear Plant Superintendent Post Office Box 1228 Crystal River, Florida 32629 s, \\
UdITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 July 6, 1979 IE Inf ormation Notice No. 79-18 SKYLAB REENTRY Description of Circumstances:
The most recent dates for reentry of Skylab are July 10 to 14, 1979, with July 12, as the most probable date.
Recognizing that c hit on a nuclear power plant would be highly unlikely by Skylab debris, the NRC believes it would be prudent for licensees to review their contingency plans in case such an event should actually occur.
The NRC is in communication with the Department of Energy (DOE), and will receive notification from them as soon as the reentry corridor can be established. This notification may occur within 1 to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> before reentry actually oct s.
If it is determined that there are any licensed nuclear power plants in the reentry corridor, the plants will receive notification from their respective Regional Office via the dedicated phone line.
This Information Notice is provided as an early notification of a possibly significant matter.
It is expected that recipients will review the informa-tion for possible applicability to their facilities. No specific action or response is requested at this time.
If further NRC evaluations so indicate, an IE Circular or Bulletin will be issued to recommend or request specific licnesee actions.
If you have questions regarding the matter, please contact the Director cf the appropriate NRC Regional Office.
No written response to this information notice is required.
t ? -,
n4l 156 7907120387
IE Information Notice No. 79-18 Enclosure July 6, 1979 Page 1 of 2 LISTING OF IE INFORMATION NOTICES ISSUED IN 1979 Information Subject Date Issued To Notice No.
Issued 79-01 Bergen-Paterson liydraulic 2/2/79 All power reactor Shock and Sway Arrestor facilities with an OL or a CP 79-02 Attempted Extortion -
2/2/79 All Fuel Facilities Low Enriched Uranium 79-03 Liritorque Valve Geared 2/9/79 All power reactor Limit Switch Lubricant facilities with an OL or a CP 79-04 Degradation cf 2/16/79 All power reactor Engineered facilities with an Safety Features OL or a CP 79-05 Use of Improper Materials 3/21/79 All power reactor in Safety-Related Components facilities with an OL or CP 79-06 Stress Analysis of 3/23/79 All Holders of Safety-Related Piping Reactor OL or CP 79-07 Rupture of Radwaste Tanks 3/26/79 All power reactor facilities with an OL or CP 79-08 Interconnection of 3/28/79 All power reactor Contaminated Systems with facilities with an Service Air Systems Used OL and Pu Processing As the Source of Breathing fuel facilities Air 79-09 Spill of Radioactively 3/30/79 All power reactor Contaminated Resin facilities with an OL 79-10 Nonconf orming Pipe 4/16/79 All power reactor Support Struts facilities with a CP 79-11 Lower Reactor Vessel Head 5/7/79 All holders of Reactor Insulation Support Problem OLs and cps j F, 7
~
Li 4 /
is/
f IE Inf ormat ion Not ice No. 79-18 Enclosure July 6, 1979 Page 2 of 2 LISTING OF IE INFORMATION ::OTICES ISS'ED IN 1979 Infortation Subject Date Issued To Notice No.
Issued 79-12 Attempted Datage to New 5/11/79 All Fuel Facilities Fuel Assemblies Research Reactors, and Power Reactors with an OL or CP 79-13 Indication of Low Water 5/29/79
/.11 Helders of Reactor Level in the Oyster Creek OLs and cps Reactor 79-14 NRC Position of Electrical 6/11/79 All Power Reactor Cable Support Systems Facilities with a CP 79-15 Deficient Procedures 6/7/79 All Holders of Reactor OLs and cps 79-16 Nuclear Incident at Three 6/22/79 All Research Reactors Mile Island and Test Reactore with OLs 79-17 Source Holder Assembly Damage 6/20/79 All Holders of Reactor Danage From Misfit Between OLs and cps Assembly and Reactor Upper Grid Plate 447 158