ML19225C532
| ML19225C532 | |
| Person / Time | |
|---|---|
| Site: | La Crosse File:Dairyland Power Cooperative icon.png |
| Issue date: | 07/11/1979 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Linder F DAIRYLAND POWER COOPERATIVE |
| References | |
| NUDOCS 7907310332 | |
| Download: ML19225C532 (1) | |
Text
_
9.a arco PDR
((y 1 o,
UNITED STATES (j
NUCLEAR REGULATORY COMMISSION
- .g * **,,.j, e REGION ill o
799 ROOSEVELT ROAD
- ....f 6,
GLEN ELLYN, ILLINOls 60137
. JUL 111979 Docket No. 50-409 Dairyland Powe Cooperative ATTN:
Mr. F. W. Linder General Manager 2615 East Avenue - South La Crosse, WI 54601 Gentlemen:
The enclosed IE Bulletin No. 79-15 is forwarded to you for action.
A written response is required.
If you desire additional information regarding this matter, please contact this office.
Sincerely, 6 B W-fr/JamesG.Keppler U
Director
Enclosures:
1.
Listing of IE Bulletins Issued in Last 12 Months cc w/ encl:
Mr. R. E. Shimshak, Plant Superintendent Central Files Director, NRR/DPM Director, NRR/ DOR PER Local PDR NSIC TIC Anthony Roisman, Esq.,
Attorney 7
'g 0$
- 9
?9 731ks s 2
U.S. N1' CLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION III Aly 11,1979 IE Bulletin No. 79-15 DEEP DRAFT PDiP DEFICIENCIES Description of Circu= stances:
On October 20, 1978, Co==cnvealth Edison Company repirted that =anufacturing deficiencies had been identified in new high pressure core spray, low pressure core spray, and residual heat re= oval pu=ps =anufactured by Ingersoll-Rand (I-R)
Cc=pany, Ca=eron Pump Division.
Each of these pu=ps is a vertical turbine pump with i=pellers located in bowls in a su=p or a self contained barrel. The motor (pri=e =over) is located at the highest pu=p elevation to take into account mui=um flooding at the site
.or space considerations. The auction is at the lower end of the pu=p wh!.le the discharge head is just below the driver. Bearings supporting the vertical shaft seg=ents (usually 5 to 10 segments) are either self lubricated, force fed (lubricated by fluid being pu= ped), er oil lubricated and =aintained within their own isolated syste=.
These pu=ps are designated as " Deep Draft".
Figures 1&2 show typical outlines of such pt ps.
The internal deficiencies, identified through d1=ensional and visual inspections were as follows:
Low Pressure Core Spray Pu=ps (I-R Model No. 29APKD-5) (Date of Manufacture -
Fe~ourary 1973)
Loose impeller bolts and bolts i= properly staked Loose key - keyway fit Excessive runout on pump shaft Bearing showed wear Bearing clearance exceeded rec a nded telerance Coupling thread galled Wear ring clearance out-af-specification I2peller-to-shaf t clearance out of specification Cracks found in second-and-third-stage i=pellers Stuffing box bushings were severely galled High Pressure Core Spray Pu=ps (I-R Model No-12TYJM - /n- ~ ' w r'e m 2
Septe=ber 1972)
DUPLICATE DOCUMENT Bearing clearance exceeded reco== ended to Wear ring clearance out-of-specification Entire document previously entered Bearings showed wear into system under: