Forwards IE Insp Repts 50-445/79-11 & 50-446/79-11 on 790402-03 & 13-23 & Notice of Violation
ML19225C404
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 05/14/1979
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML19225C405 List:
References
NUDOCS 7907300242
Download: ML19225C404 (2)


See also: IR 05000445/1979011

Text

,

}- /) R

"

.

[pa afog 'o,

NUCLEAR REGULATO"" COMMISSION

UNITED STAT 5S

[

'n

REGION IJ

{j

.g

611 RYAN PLAZA DRIVE, SUITE 1000

o, .,

[

AR LINGTON, TEXAS 76011

%, * * " * f

May 14, 1979

In Reply Refer To:

RIV

'

Docket No. 50-445/Rpt. 79-11

50-446/Rpt. 79-11

.

Texas Utilities Generating Company

ATTN: Mr. R. J. Gary, Executive Vice

President and General Manager

2001 Bryan Tower

Dallas, Texas

75201

Gentlemen :

This refers to the investigation conducted by Mr. R. G. Taylor and other

members of our staff on April 2-3 and April 13-23, 1979, of activities

authorized by NRC Construction Permits No. CPPR-126 and 127 for the

Comanche Peak facility, Units No. 1 and 2, concerning allegations by a

former Comanche Peak employee.

The investigation and our findings are discussed in the enclosed

investigation report.

During the investigation, it was found that certain activities under

your license appear to be in noncompliance with Appendix B to 10 CFR 50 of the NRC Regulations, " Quality Assurance Criteria for Nuclear

Power Plants." The item of noncompliance and references to the per-

tinent requirements are identified in the enclosed Notice of Violation.

This notice is sent to you pursuant to the provisions tf Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Section 2.201 requires you to submit to this office, within

30 days of your receipt of this notice, a written statement or explanation

in reply including: (1) carrective steps which have been taken by you, and

the results achieved; (2) corrective steps which will be taken to avoid

further noncompliance; and (3) the date when full compliance will be

achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed investigation report will be placed in the NRC's Public Document

Room.

If the report contains any information that you believe to be

f

79 0730 0 li

N

'

.

Texas Utilities Generating

Company

W 1979.

,.

proprietary, it is necessary that you submit a written application to

this office, within 20 days of the date of this letter, requesting that

such infonnation be withheld from public disclosure.

The application

must include a full statement of the reasons why it is claimed that the

information is proprietary. The application should be prepared so that

.

any proprietary information identified is contained in an enclosure to

the application, since the application without the enclosure will also

be placed in the Public Document Room.

If we do not hear from you in

this regard within the specified period, the report will be placed in

the Public Document Room.

Should you have any questions concerning this investigation, we will

be pleased to discuss them with you.

Sincerely,

f

I

W. C. Seid

, Chief

_

Reactor Co.mtruction and

Engineer:.1 Support Branch

Enclosures:

1.

Appen' dix A, Notice of Violation

2.

IE Investigation Report No. 50-445/79-11

50-446/79-11

cc: w/ enclosures

'

Texas Utilities Generating Company

ATTN: Mr. H. C. Schmidt, Project Manager

2001 Bryan Tower

Dallas, Texas

75201

.