ML19225C193

From kanterella
Jump to navigation Jump to search
Confirms 790518 Verbal Communication W/Rg Taylor Concerning Potential RO Re Possibility That Pipe Supports May Not Meet Seismic Requirements.Investigation & Evaluation Continue
ML19225C193
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/15/1979
From: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
TXX-2999, NUDOCS 7907260647
Download: ML19225C193 (1)


Text

.

,y ,

, ' '~_

TEX AS UTII.ITIES GENERATING CO.TIPANY 2001 'iHYAN TO% EH D \t l.As Ti:N A5 7tWO1 June 15, 1979 R. J GARY "l .,:.'.:'::".:l:'

Mr. W. C. Seidle, Chief Reactor Construction & Engineering Support Branch U. S. fluclear Regulatory Conmission Office of Inspection & Enforcement 611 Ryan Plaza Dr., Suite 1000 Docket Nos. 50-445 Arlington, Texas 76012 50-446 COMAfiCHE PEAK STEAM ELECTRIC STATION

!981-83 2300 MW INSTALLATI0fl PIPE SUPPORTS FILE NO. 10110

Dear Mr. Seidle:

On flay 18, 1979, we verbally informed your Mr. R. G. Taylor that pipe supports as presently designed may not meet seismic requirements. We considered this "potentially" reportable under 10 CFR 50.55(e).

We are continuing our investigation and evaluation and will notify you as soon as we have reached a conclusion.

Very truly yours, dg R . J . Ga ry' RJG:dl; cc: NRC Region IV - (0 + 1 copy)

Director, Inspection & Enforcement - (15 copies) c/o Distribution Services Branch, DDC, ADM.

U. S. Nuclear Regulatory Commission Washington, D. C. 20555 413 253 7907260 g