ML19225C193
| ML19225C193 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 06/15/1979 |
| From: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| TXX-2999, NUDOCS 7907260647 | |
| Download: ML19225C193 (1) | |
Text
,y
, ' '~_
TEX AS UTII.ITIES GENERATING CO.TIPANY 2001 'iHYAN TO% EH D \\t l.As Ti:N A5 7tWO1 June 15, 1979 R. J GARY "l
.,:.'.:'::".:l:'
Mr. W. C. Seidle, Chief Reactor Construction & Engineering Support Branch U. S. fluclear Regulatory Conmission Office of Inspection & Enforcement 611 Ryan Plaza Dr., Suite 1000 Docket Nos. 50-445 Arlington, Texas 76012 50-446 COMAfiCHE PEAK STEAM ELECTRIC STATION
!981-83 2300 MW INSTALLATI0fl PIPE SUPPORTS FILE NO.
10110
Dear Mr. Seidle:
On flay 18, 1979, we verbally informed your Mr. R. G. Taylor that pipe supports as presently designed may not meet seismic requirements. We considered this "potentially" reportable under 10 CFR 50.55(e).
We are continuing our investigation and evaluation and will notify you as soon as we have reached a conclusion.
Very truly yours, dg R. J. Ga ry' RJG:dl; cc:
NRC Region IV - (0 + 1 copy)
Director, Inspection & Enforcement - (15 copies) c/o Distribution Services Branch, DDC, ADM.
U. S. Nuclear Regulatory Commission Washington, D. C.
20555 413 253 7907260 g