TXX-2999, Notifies That 1981-83 2,300 MW Installation Pipe Supports May Not Meet Seismic Requirements.Condition May Be Reportable.Investigation Continuing
| ML19270G743 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 06/15/1979 |
| From: | Gary R TEXAS UTILITIES CO. |
| To: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| TXX-2999, NUDOCS 7906190209 | |
| Download: ML19270G743 (1) | |
Text
TENAS UTILITIES GENERATING COMI%NY 2001 IntYAN Toh Eit DALLAM. TEXAN 75001 June 15, 1979 R. J. GARY
"::U'.C' T.':'
Mr. W. C. Seidle, Chief Reactor Construction & Engineering Support Branch U. S. Nuclear Regulatory Commission Office of Inspection & Enforcement 611 Ryan Plaza Dr., Suite 1000 Docket Nos. 50-445 Arlington, Texas 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION 1981-33 2300 MW INSTALLATION PIPE SUPPORTS FILE NO.
10110
Dear Mr. Seidle:
On May 18, 1979, we verbally informed your Mr. R. G. Taylor that pipe supports as presently designed may not meet seismic requirements. We considered this "potentially" reportable under 10 CFR 50.55(e).
We are continuing our investigation and evaluation and will notify you as soon as we have reached a conclusion.
Very truly yours, f.
R. J. Gar RJG:dla cc: NRC Region IV - (0 + 1 copy)
Director, Inspection & Enforcement - (15 copies) c/o Distribution Services Branch, DDC, ADM.
U. S. Nuclear Regulatory Commission Washington, D. C.
20555 2344 137 7906190Adf 5900