ML19225B897

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-010/79-11,50-237/79-14 & 50-249/79-12 on 790522.No Noncompliance Noted
ML19225B897
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 06/07/1979
From: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
Shared Package
ML19225B918 List:
References
NUDOCS 7907260223
Download: ML19225B897 (2)


See also: IR 05000010/1979011

Text

e

TIC

p*" ego

UNITED sTAl s

q[0

.

f

g

NUCLEAR

' EGULATORY COMMISSION

<<

,

y

ir(i

o

REGloN til

En

f

799 ROOSE VELT RO AD

a

cLEN ELLYN ILUNOf S 60137

f

s,

-

JUN 7

1979

Docket No. 50-10

Docket No. 50-237

Docket No. 50-249

.

Commonwealth Edison Company

ATTN:

Mr. Byron Lee, Jr.

Vice President

P. O. Box 767

Chicago, IL

60690

Gentlemen:

This refers to the inspection conducted by Messrs. W. B. Grant,

J. L. Barker and J. W. Hiatt and Miss R. J. Greer of this office on

May 22, 1979, of activities at Dresden Nuclear Generating Station, Units

1, 2, and 3, authorized by Licenses No. DPR-2, No. DPR-19 and No. DPR-25

and to the discussion of our findings with Mr. V. Chaney and others of

your staff at the critique held following the drill.

The enclosed copy of our inspection report identifies areas exan.ined

during the inspection.

Within these areas, the inspection consisted of a

selective examination of procedures and representati"e records,

observations, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with Section 2 790 of the NRC's " Rules of Practice," Part

2, *4 tle 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you or

your contractors believe to be proprietary, you must apply in writing to

this office, within twenty days of your receipt of this letter, to

withu ld such information from public disclosure. The application must

include a full statement of the reasons for which the information is con-

sidered proprietary, and thould be prepared so that proprietary

information identified in the application is contained in an eac1csure to

the application.

398

350

-

r'

r

7907I6 coa 3

pW

.

&

Commonwealth Edison

-

2-

JUN 7

1973

Company

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

A. B. Davis, Chief

Fuel Facility and

Materials Safety Branch

Enclosure:

IE Inspection Rpts

No. 50-10/79-11, No. 50-237/79-14,

and No. 50-249/79-12

cc w/ encl:

Mr. B. B. Stephenson, Station

Superintendent

Central Files

Reproduction Unit h

.Ob

'

PDR

Local PDR

NSIC

TIC

Anthony Roisman, Esq.,

Attorney

Mr. Dean Hansell, Office of

Assistant Attorney General

398

351

4