ML19225B394

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-348/79-20 on 790516-18.No Noncompliance Noted
ML19225B394
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 06/04/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Clayton F
ALABAMA POWER CO.
Shared Package
ML19225B391 List:
References
NUDOCS 7907250103
Download: ML19225B394 (2)


See also: IR 05000348/1979020

Text

~

- . .

_ . . . . . . .

. . .

.

.-

--

-

DD

-

, , ,'u

.

UNITED STATES

l'3.,,([n

NUCLEAR REGULATORY COMMISSION

i

3

- V* - E

REGION ll

101 MARIETTA sT., N.Vv., sulTE 3100

o,

ATLANT A GEORGI A 30303

e

Juti 0 41979

.....

In Reply Refer To:

RII:WPA

50-348/79-20

Alabama Power Company

Atta:

?. L. Clayton, Jr.

Senior Vice President

Post Office Box 2641

Birmingham, Alsbama 35291

Gentlemen:

This refers to the inspection conducted by W. P. Ang of this office on

May 16-18, 1979 of activities authorized by NRC License No. NPF-2 for

the Farley Nuclear Plant facility, Unit 1, and to the discussion of our

findings held with W. G. Hairston at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncotcpliance were

disclosed.

In accordance with Section 2.7s0 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any infomation that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application aust

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained

in a separate part of the document.

If we do cot hear from you in this

regard within the specified period, the report will be placed in the

Public Document Room.

417

353

mmom

.

.

.

. . . . - .

.

.

.

JUN 0 41979

.

.

Alabama Power Company

-2-

'

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

_

Charles E. Murphy, Chief

Reactor Con aruction and

Engineering Support Branch

Enclosure:

Inspection Report Wo. 50-348/79-20

cc w/enclostre:

A. R. Barton

Executive Vice President

Post Office Box 2641

Birmingham, Alabama 35291

H. O. Thrash

Manager-Nuclear Generation

Post Office Box 7' .

Birmingham, Alabama 35291

C. Biddinger, Jr.

Manager-Corporate Quality Assurance

Poi,t Office Box 2641

Birmingham, Alabama 35291

W. G. Hairston III

Plant Manager

Drawer 470

Ashford, Alabama 36312

R. E. Hollands, Jr.

QA Supervisor

Post Offier Box U

Ashford, Alabama 36312

417

354

, . _ _ _

. . .

7

.