ML19225B394
| ML19225B394 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 06/04/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Clayton F ALABAMA POWER CO. |
| Shared Package | |
| ML19225B391 | List: |
| References | |
| NUDOCS 7907250103 | |
| Download: ML19225B394 (2) | |
See also: IR 05000348/1979020
Text
~
- . .
_ . . . . . . .
. . .
.
.-
--
-
-
, , ,'u
.
UNITED STATES
l'3.,,([n
NUCLEAR REGULATORY COMMISSION
i
3
- V* - E
REGION ll
101 MARIETTA sT., N.Vv., sulTE 3100
o,
ATLANT A GEORGI A 30303
e
Juti 0 41979
.....
In Reply Refer To:
RII:WPA
50-348/79-20
Alabama Power Company
Atta:
?. L. Clayton, Jr.
Senior Vice President
Post Office Box 2641
Birmingham, Alsbama 35291
Gentlemen:
This refers to the inspection conducted by W. P. Ang of this office on
May 16-18, 1979 of activities authorized by NRC License No. NPF-2 for
the Farley Nuclear Plant facility, Unit 1, and to the discussion of our
findings held with W. G. Hairston at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspectors.
Within the scope of this inspection, no items of noncotcpliance were
disclosed.
In accordance with Section 2.7s0 of the NRC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any infomation that you (or
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure. Any such application aust
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained
in a separate part of the document.
If we do cot hear from you in this
regard within the specified period, the report will be placed in the
Public Document Room.
417
353
mmom
.
.
.
. . . . - .
.
.
.
JUN 0 41979
.
.
Alabama Power Company
-2-
'
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
_
Charles E. Murphy, Chief
Reactor Con aruction and
Engineering Support Branch
Enclosure:
Inspection Report Wo. 50-348/79-20
cc w/enclostre:
A. R. Barton
Executive Vice President
Post Office Box 2641
Birmingham, Alabama 35291
H. O. Thrash
Manager-Nuclear Generation
Post Office Box 7' .
Birmingham, Alabama 35291
C. Biddinger, Jr.
Manager-Corporate Quality Assurance
Poi,t Office Box 2641
Birmingham, Alabama 35291
W. G. Hairston III
Plant Manager
Drawer 470
Ashford, Alabama 36312
R. E. Hollands, Jr.
QA Supervisor
Post Offier Box U
Ashford, Alabama 36312
417
354
, . _ _ _
. . .
7
.