ML19225A876
| ML19225A876 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 05/31/1979 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Herbein J METROPOLITAN EDISON CO. |
| Shared Package | |
| ML19225A878 | List: |
| References | |
| NUDOCS 7907200501 | |
| Download: ML19225A876 (2) | |
See also: IR 05000289/1979011
Text
.g
4. .
UNITED STATES
, nggg
o
NUCLEAR REGULATORY COMMISSION
77
7
}),'
g
REGION I
y
$
, g
631 PARK AVENUE
"f
KING OF PRUSSI A, PENNSYLV ANI A 19406
S 'A
- g
%,
%
+ ..*
Docket No. 50-289
Metropolitan Edison Company
ATTN:
Mr. J. G. Herbein
Vice President - Generation
P. O. Box 542
Reading, Pennsylvania
19640
Gentlemen:
Subject:
Inspection 50-289/79-11
This refers to the inspection conducted by Mr. D. Haverkamp of this office on
April 19-21, 1979 at Three Mile Island Nuclear Station, Unit 1, Middletown,
Pennsylvania of activities authorized by NRC License No. DPR-50 and to the
discussions of our findings held by Mr. Haverkamp with Mr. J. Seelinger of your
staff on April 23, 1979 at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Decument Room.
If this report contains
any information that you (or your contractor) believe to be prcprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must be
accompanied by an c.ffidavit executed by the owner of the information, which
identifies the document or part sought to be withheld, and which contains a
statement of reasons which addresses with specificity the items which will be
considered by the Cocmission as listed in subparagraph (b) (4) of Section
2.790.
The information sought to be withheld shall be incorporated as far as
possible into a separate part of the affidavit.
If we do not hear from you in
this regard within the specified period, the report will be placed in the Public
Document Room.
I.
79072005o(
366
077
..
.
MAY 3 1 IS7S
Metropolitan Edison Company
2
No reply to this letter is required; however, if you should have any questions
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
/ 0
[ h
^v
E
n J. Brunner, Chief
R$ etor Operations and Nuclear
S pport Branch
Enclosure:
Office of Inspection and Enforcement Inspection
Report Number 50-289/79-11
cc w/ enc 1:
E. G. Wallace, Licensing Manager
J. J. Barton, Project Manager
L. L. Lawyer, Manager - Generating Operations
G. P. Miller, Manager - Generating Station - Nuclear
J. L. Seelinger, Unit 1 Superintendent
W. E. Potts, Unit 1 Superintendent - Technical Support
I. R. Finfrock, Jr.
Mr. R. Conrad
G. F. Trowbridge, Esquire
Miss Mary V. Southard, Chairman, Citizens for a Safe Environment
(Without Report)
366
078