ML19225A521

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-010/79-08,50-237/79-12 & 50-249/79-10 on 790402-30 & Notice of Violation
ML19225A521
Person / Time
Site: Dresden  
Issue date: 05/14/1979
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
Shared Package
ML19225A522 List:
References
NUDOCS 7907190492
Download: ML19225A521 (2)


See also: IR 05000010/1979008

Text

?

I

TIC

W

4,?

UNITED STATES

f

.&

NUCLEAR REGULATORY COMMISSION

f ,, i

j

REGloN ill

&

'

g

799 RooSE VE LT Ro AD

- -

P

GLEN E LLYN. ILLINolS 60137

....-

MAY 141979

Docket No. 50-10

Docket No. 50-237

Docket No. 50-249

Commonwealth Edison Company

ATTF:

Mr. Byron Lee, Jr.

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the inspection conducted by Mr. J. L. Barker of this

office on April 2-30, 1979, of activities at Dresden Nuclear Power

Station, Units 1, 2 and 3, authorized by NRC Operating Licenses No.

DPR-2, No. DPR-19 and No. DPR-25 and to the discussion of our findings

with Mr. B.

B. Stephenson and others of your staff at the conclusion

of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted

of a selective examination of procedures and representative records,

observations, and interviews with personnel.

During this inspection, certain of your activities appeared to be in

noncompliance with NRC requirements, as described in the enclosed

Appendix A.

The inspection showed that action had been taken to

correct the identified noncompliance and to prevent recurrence.

Consequently, no reply to this noncompliance is required and we have

no further questions regarding this matter at this time.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

and the enclosed inspection report will be placed in the NRC's

Public Document Room, except as follows.

If this report contains

information that you or your contractors believe to be proprietary,

you must apply in writing to this office, within twenty days of your

receipt of this letter, to withhold such information from public

disclosure. The application must include a full statement of the

reasons for which the information is considered proprietary, and

should be prepared so that proprietary information identified in the

application is contained in an enclosure to the application.

353

078

7so m

a

MAY 1 4 1979

.

Commonwealth Edison

-2-

Company

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

/c

w

. F. Heishman, Chief

Reactor Operations and

Nuclear Support Branch

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Reports

No. 50-10/79-0S; No.

50-237/79-12 and No.

50-249/79-10

cc w/encls:

Mr. B.

B. Stephenson,

Station Superintendent

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Anthony Reisman, Esq.,

Attorney

Mr. Dean Hansell, Office of

Assistant Attorney General

353

079