e' "f %
UNITED STATES
8
4'o,
NUCLEAR REGULATORY COMMISSION
=
+
- s
e'
n
REGION 11
s
- 9- (
g
101 M ARIETT A ST REET.N W.
3
"'
c
b
ATLANTA. GEORGI A 30303
%, * * *'
,,c
APR r 31979
In Reply Refer To:
RII:RMC
,
50d321/79-7
i
50-366/79-8
Georgia Power Company
ATTN:
Mr. J. H. Mille r , Jr.
Executive Vice President
270 Peacht ree St reet , N.W.
Atlanta, Georgia 30303
Gentlemen:
This refers to the .nspection conducted by R. M. Compton of this office on
February 20-22, 1979 and February 28 - March 2,1979, of activities authorized
by NRC Permit Nos. DPR-5 7 and NPF-5 f or the E
1. Ha t ch l' nits 1 and 2 facilities,
and to the discussion of our findings held with M. Manry at the conclusion of
the inspect ion.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consis*ed of
selective examinations of procedures and representative records, interviews
with personnel, and observat ions by the inspec t ors .
Two new unresolved items resulted from this inspection and are discussed in
the enclosed report
These items will be examined during subsequent inspections.
During the inspe c t ion , it was found that certain ac tivities under your license
appea r to be in noncompliance with NRC requi rement s.
These items and ref erences
pertinent requirements are listen in the Notice of Violation enclosed
to
herewith as Appendix A.
This notice is sent to you pursuant to the provisions
of Section 2.201 of the NRC's " Rules of Pract ic e ," Part 2, Title 10 Code of
Federal Regulations.
Section 2.201 requires you to submit to this office,
within 20 days of yor rec eipt of this not ic e , a written statement or explanation
in reply including:
(1) corrective steps wh.ch have been taken by you and
the results achieved; (2) corrective steps which will be taken to avoid
f urthe r ncancompl i ance , and (3) the date when f ull compliance will be achiv-ved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
a copy of this letter and th" encl < sed
Title 10. Cade of Federal Regulations,
inspection report will be placed in the NRC's Public Document Room.
't
this
report contains any information that you (or your contractor) believe to be
necessary that you make a writ ten application within 20
proprietary, it
is
-5
..
-+
7
atP]
d
1b
41
N
.
.
APR 0 21379
'
Georgia Power Company
-2-
days to this of fice to withhold such informa mion f rora public disclosure
Any
such application must include a full statement of the reasons on the basis of
, which it is claimed that the information is proprietary, ar.d shjuld be prepared
so that proprietary information identified in the application is contained in
a separate part of the document.
If we do not hear from you in this regard
within the specified period, the report will be placed in the Public Document
Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
,
/
. w
Charles E. .orphy, Chief
Reactor Construction and Engineering
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-321/79-7
und 50-366/79-8
cc w/ encl:
Mr. M. Manry, Plant Manager
Plant E. 1. Hatch
P. O.
Box 442
Baxley, Georgia
31513
Mr. C. E. Belflower
Site QA Supervisor
Plant E.
I. Hatch
P. O. Box 442
Baxley, Georgia 31513
7i/
77q
J 'fti
JJ>
_