Responds to NRC Re Violations Noted in IE Insp Repts 50-321/79-07 & 50-366/79-08.Corrective Actions: Importance of Corrective Action Verification Emphasized During Regular Training Sessions
ML19225A369
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 04/25/1979
From: Staffa R
GEORGIA POWER CO.
To: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19225A360 List:
References
NUDOCS 7907190095
Download: ML19225A369 (2)


Text

{{#Wiki_filter:"O'.(Ig , Georg a Power Company o 7 '\\ 230 Peachtree Sucet Post Ofhce Bcx 4545 ~ At:anta. Georgia 30303 leiephone 404 522 0000 o-bCOIhl NOWLi Power Supply Engineering and e i April 25, 1979 United States Nuclear Regulatory Commission

REFERENCE:

Office of Inspection and Enforcement RII: RCM Region II - Suite 3100 50-321/79-7 101 Marietta Street 50-366/79-8 Atlanta, Georgia 30303 ATTENTION: Mr. C. E. Murphy Centlemen: The Georgia Power Company offers the foll m ng information in response to your letter of April 2, 1979, describing apparent items of noncompliance with NRC requirements noted during your February 20 - 22 and February 28 - March 2, 1979, inspection of the Hatch Nuclear Plant. Infraction 366/79-08-02 To insure that installed concrete expansion anchors at Plant Hatch meet or exceed the design strength requirement, Procedures HNP-2-11005 " Inspection and Testing Procedure for Concrete Expansion Anchors", and HNP-6942 "Installa-tion and Inspection of Concrete Expansion Anchors Used in Class I 6 II Seismic Systems" have been prepared. These procedures prescribe the inspection-testing methods, testing frequency, acceptance criteria, and documentation to be utilized for the concrete expansion anchor test program. Complet1 of the testing and repair of Unit 2 anchors will be completed before plant startup which is presently scheduled for May 10, 1979. Associated documcntation should be on file by June 15, 1979. The testing and repair of anchors for Unit 1 began on April 23, 1979, and will be completed before plant etartup after the refueling outage. In order to reduce the possibility of similar occurrences in the future, the importance of proper corrective action verification has been emphasized during the regular training sessions sponsored and attended by QA field personnel. Infraction 366/78-08-03 The Georgia Power Compeny has undertaken a review of its significant defi-ciency reporting procedures with consideration of the concrete expansion anchor problems experienced at Plant Hatch, and we have determined that our present procedures are adequate. However, appropriate personnel will be reminded that if any doubt exists as to the reportability of a deficiency under the require-

  1. pdIf 347 332 7po s muu m;

Georgia Power b U. S. Nuclear Regulatory Commission ATTN: Mr. C. E. Murphy Page Two Ap il 25, 1979 ments of 10 CFR 50.55(e), then they shall report the deficiency for additional evaluation. Full co=pliance will be achieved by May 1, 1979. contains no information which is believed to be The inspection report proprietary. Very truly yours, OB R. W. Staffa RCW/bg 7 7. 'k ) [. -{ .J' }}}