ML19225A114
| ML19225A114 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 05/17/1979 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Counsil W NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML19225A115 | List: |
| References | |
| NUDOCS 7907180441 | |
| Download: ML19225A114 (2) | |
See also: IR 05000336/1979011
Text
C< -
.t
.
4#"D
UNITED STATES
c
p
NUCLEAR REGULATORY COMMISSION
j *j * (g 4$
,
RJGION I
d F
- -
^f
631 PARK AVFNUE
[
KING OF PRUS$1 A, PENNSYLV ANI A 19406
MM 17 BH
Docket No. 50-336
Northeast Nuclear Energy Company
ATTN: Mr. W. G. Counsil
Vice President - Nuclear
Engineering and Operations
P. O. Box 270
Hartford, Connecticut
06101
Gentlemen:
Subject:
Inspection 79-11
This refers to the inspection conducted by Mr. J. C. Higgins of this
office on April 10 - 13, 1979 at Millstone Nuclear Power Station, Unit
No. 2, Waterford, Connecticut of activities authorized by NRC License
No. DPR-65 and to the discussions of our findings held by fir. Higgins
with Mr. J. Opeka at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of
Inspection and Enforcement Inspection Report which is enclosed with this
letter. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, measurements made by the inspector, and observations by the
inspector.
Within the scope of this inspection, no items of noncompliance were
observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be p' aced in the NRC's Public Document
Room.
If this report contains any information that you (or your contractor)
believe to be proprietary, it is necessary that you make a written
application within 20 days to this office to withhold such information
from public disclosure.
Any such application must be accompanied by an
affidavit executed by the owner of the information, which identifies the
document or part sought to be withheld, and which contains a statement
of reasons which addresses with specificity the items which will be
considered by the Commission as listed in subparagraph (b)(4) of Section
2.790.
The information sought to be withheld shall be incorporated as
far as possible into a separate part of the affidavit.
If .e do not
hear from you in this regard within the specified period, the report
will be placed in the Public Document Room.
79 07180 uy/
.
.
flortheast Nuclear Energy Company
2
MAY l'i 1373
No reply to this letter is required; however, if you should have any
questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
.' Brunner, ChieP
1
n
Reactor Operations and Nuclear
Support Branch
Enclosure:
Office of Inspection and Enforcement Inspection
Report Number 50-336/79-11
cc w/ encl:
J. F. Opeka, Station Superintendent
D. G. Diedrick, Manager of Quality Assurance
J. R. Himmelwright, Licensing Safeguards Engineer
34[
C 2,2