ML19224D629
| ML19224D629 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 07/02/1979 |
| From: | Engelken R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| References | |
| NUDOCS 7907130198 | |
| Download: ML19224D629 (1) | |
Text
- pa pe cg UNITED STATES o
E'
$, g(3.c.'{
NUCLEAR REGULATORY COMMISSION r g 1990 N. CALIFORNI A COULEVARD
'~ ~q 3'd REGION V 4y S,* 6 "
o SUITE 202, WALNUT CREEK PLAZA U
c>
WALNUT CRE E K, CAllFORNI A 94596 July 2, 1979 Docket Mos. 50-528 50-529 50-530 Arizona Public Service Company P. O. Box 21666 Phoenix, Arizona 83036 Attention: i4r. E. E. Van Brunt, Jr.
Vice President, Construction Projects Gentlemen:
The enclosed Bulletin 79-14 is forwarded to you for action.
Written responses are required.
If you desire additional information regarding this matter, please contact this office.
Sincerely, l'?U[,,, a 1(. -
R. H. Engelken Director
Enclosures:
1.
IE Bulletin fio. 79-14 with Appendix A 2.
Listing of IE Bulletins issued in Last 12 idonths cc w/ enclosures:
F. W. Hartley, APS 369 072
,/
I 7907130 Y6 C(
5 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C.
20555 July 2,1979 IE Bulletin No. 79-14 SEISMIC ANALYSES FOR AS-BUILT SAFETY-RELATED PIPING SYSTEMS Description of Circumstances:
Recently two issues were identified which can cause seismic analysis of safety-related piping systems to yield nonconservative results.
One issue involved igebraic summation of loads in some seismic analyses.
This was addressed in show cause orders for Beaver Valley, Fitzpatrick, Maine Yankee and Surry.
It was also addressed in IE Bulletin 79-07 which was sent to all power reactor licensees.
The other issue involves the accuracy of the information input for seismic analyses.
In this regard, several potentially unconservative factors were discovered and subsequently addressed in IE Bulletin 79-02 (pipe supports) and 79-04 (valve weights).
During resolution of these concerns, inspection by IE and by licensees of the as-built configuration of several piping systems revealed a number of nonconformances to design documents which could potentially affect the validity of seismic analyses.
Nonconformances are identified in Appendix A to this bulletin.
Because apparently significant non-conformances to design documents have occurred in a number of plants, this issue is generic.
The staff has determined, where design specifications and drawings are used to obtain input information for seismic analysis of safety-related piping systems, that it is essential for these documents to reflect as-built con-figurations. Where subsequent use, damage or modifications affect the con-dition or configuration of safety-related piping systems as described in documents from which seismic analysis input information was obtained, the licensee must consider the need to re-evaluate the seismic analyses to con-sider the as-built configuration.
9 073
{DUPLIATE UMENT I Entire document previously entered into system under:
~/ 9 0 7 C b O 3 9 b No. of pages:
b I
m.w m___ _ u
__o