ML19224C595
| ML19224C595 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 01/31/1979 |
| From: | Galen Smith NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Leonard J POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
| Shared Package | |
| ML19224C592 | List: |
| References | |
| NUDOCS 7907030062 | |
| Download: ML19224C595 (3) | |
See also: IR 05000333/1978028
Text
" h *'a %
UNITED STATES
.,$.
t
NUCLEAR REGULATORY COMMISSION
+
ff.
REGION I
e
f
$31 PAR 4 AVENUE
.,
KING OF PRUS$1 A, PENNSYLV ANI A 1940E
.....
Docket No. 50-333
Power Authority of the State of New York
James A. FitzPatrick Nuclear Power Plant
ATTN: Mr. J. D. Leonard
Resident Manager
P. O. Box 41
Lyccming, New York 13093
Gentlemen:
Subject:
Inspection 50-333/78-28
This refers to the inspection conducted by Mr. K. Plumlee of this office
on December 4-7, 1978, at the James A. FitzPatrick Nuclear Power Plant,
of activities authorized by NRC License No. DPR-59, and to the discussions
of our findings held by Mr. Plumlee with Mr. J. Leonard of your staff at
the conclusion of the inspection.
Areas examined during this inspection are described in the Office of
Inspection and Enforcement Inspection Report which is enclosed with this
letter. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, measurements made by the inspector, and observations by the
inspector.
Our inspector also verified the steps you had taken to correct the Items
of Noncompliance brought to your attention in a letter dated October 30,
1978. We have no further questions regarding your action at this time.
Based on the results of this inspection, it appears that certain of your
activities were not conducted in full compliance with NRC requirements,
as set forth in the Notice of Violation, enclosed herewith as Appendix
A.
These items of noncompliance have been categorized into the levels
as described in our correspondence to you dated December 31, 1974.
This
notice is sent to you pursuant to the provisions of Section 2.201 of the
NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this office, within twenty (20)
days of your receipt of this m)tice, a written statement or explanation
in reply including:
(1) corrective steps which have been taken by you
and the results achieved; (2) corrective steps which will be taken to
avoid further items of noncompliance; and (3) the date when full com-
pliance will be achieved.
272 336
0300
0 07
,
.
.
.
Power Authority of the State of
2
With respect to Appendix A, we note that you have corrected Items No. A,
E and F and, therefore you need not address yourself to these matters in
your response.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosures will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to
be proprietary, it is necessary that you make a written application
within 20 days to this office to withhold such information from public
discicsure. Any such application must be accompanied by an affidavit
'xecuted by the owner of the information, which identifies the document
part sought to be withheld, and which contains a statement of reasons
sich addresses with specificity the items which will be considered by
the Commission as listed in subparagraph (b)(4) of Section 2.790.
The
information sought to be withheld shall be incorporated as far as pos-
sible into a separate part of the affidavit.
If we do not hear from you
in this regard within the specified period, the report will be placed in
the Public Document Room.
Should you have any questions concerning this inspection, we will be
.ased to discuss them with you.
Sincerely,
.
G org
H. Smith, Chief
F el Facility and Materia's Safety
ranch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Office cf Inspection and Enforcement Inspection Report Number
- 50-333/78-28
Q]2 3
.
.
Power Authority of the State
3
of New York
cc w/ encl:
George T. Berry, General Manager and Chief Engineer
P. W.- Lyon, Mar.2ger - Nuclear Operations
A. Klausmann, Director, Quality Assurance
M. C. Cosgrove, Quality Assurance Si:7 arvisor
J. F. Davis, Chairr.an, Safety Review Comittee
L. R. Bennett, Assistant General Manager - General Counsel
G. M. Wilverding, Licensing Supervisor
272
338