Text
,
~,
z TMI DOCUMENTS
/; ' ' '
2-DOCUMENT NO:
i f
s rig
/7 0F DOC'.rt.NT PROVIDED BY COFI MADE ON f
i METROPOLITAN EDISON COMPANY.
(E6k "
'n'ilda R.
.11inix, NRC 7 9 0 613 0 i:.svi I
c.f L
6
~
.W & T M $6-~cC{
2303-M27A/B CONT.906-'.m :Vd.pv n~~ 4 U
fJ 03/30/78 THREE MILE ISLAND NUCLE AR STATION UNIT #2 SUP,VEILLANCE PROCECURE 2303-M27A/3 MOTOR DRIVEN EMERGENCY FEEDPUMP FU."CTIONAL TEST AND VALVE OPERASILITY TEST Table of Effective Pages Page Date Revision Page Date Revision Pace Date R evision 1.0 12/01/77 1
26.0 51.0 2.0 12/01/77 1
27.0 52.0 3.0 05/04/73 3
28.0 53.0 4.0 05/04/78 3
29.0 54.0 5.0 05/04/78 3
30.0 55.0 6.0 05/04/78 3
31.0 56.t 7.0 03/30/78 4
32.0 57.0 8.0 05/04/78 3
33.0 58.0 9.0 03/30/78 4
34.0 59.0 10.0 05/04/78 3
35.0 60.0 11.0 03/30/78 4
36.0 61.0 12.0 12/01/77 1
37.0 62.0 13.0 05/C4/78 3
38.0 63.0 14.0 03/30/78 4
39.0 64.0 15.0 12 '01/77 1
40.0 65.0 16.0 05/04/78 3
41.0 66.0 17.0 03/30/78 4
42.0 67.0 18.0 08/30/78 4
43.0 68.0 19.0 44.0 69.0 20.0 45.0 70.0 21.0 46.0 71.0 22.0 47.0 72.0 23.0 48.0 73.0 24.0 49.0 74.0 25.0 50.0 75.0 Unit i Staff Recommends Approwl Unit 2 Staff Recommends Approva!
NN, Date Approval
/I,'
Date Approval Cc;ni: ant Cs;t. Head Ccgnizant Ocpt. Head Unit 1 PORC Recommends Approval Unit 2 PORC Recommends Approval
/
Date k[dOM A Date ' b o
-' S Chaircran at FORC V-Chair. Tan of FO RC Unit 1 Superintendent Approval Unit 2 Superintenden Approval g.lh
~
.' ~
~
Date i
Data '
/
Manager Generaticn Cua!ity Assurance Approval N'/
Date TMI 55 A R vy 3f77 r,
e j
{b
- f. ' i O
l' 2303-M27A/B
~
Revision 1 12/01/77 THREE MILE ISLAND fiUCLEAR STATION UNIT #2 SURVEILLAtiCE PROCEDURE 2303-M27A/B MOTOR DRIVEN EMERGENCY FEEOPUMP FUNCTIO.'!AL TEST AND VALVE CPERABILITY TEST t:0TE:
2303-M2.7A includes pump and. valve testing,.2303-M273
~
---_--...-.----;--r---
y_.
_ _ - ~.--
~_ -
inblbdespUmp' testing ~only~.
~ ~ ~
~- "
1.0 PURPOSE 1.1 To insure coraliance with Technical Specification 4.0.5 which references ACME Section XI for testing of pumps.
ASME Section XI specifies test quantities to be me=sured and acceptable ranges for those quantities.
1.2 To insure ccmpliance with TMI Unit #2 iechnical Specifications, Se ction 4.0.5.a, which states:
Inservice testing of ASME Code Class 1, 2, and 3 pumps and valves shall be performed in accordance with Section XI of the ASME Soiler and Pressure Vessel Code and applicable addenda as required by 10 CFR50, Section 50.5Sa(g).
The above inservice testing will confirm the operation of the f::':,ing ASME Code Class 3 valves:
EF-V1 A and 3 and EF-V27 A and B and EF-V2 (CLOSED) 2.0 12:LIC23LE SURVEILL.2NCE FREQUENCY AND MODES 2.1 Eurveillance Frequency --
31 Jays (M) for the pump tests (2303-M273) 92 days (Q) for the valve tests (2303-M27A)
NOTE:
Subsection 6.1 of this procedure includes both valve and pump testing; subsection 6.2 includes pump testing only.
If 2303-N27A and 2303-M273 c,
< ? <
l.0 Li7 d!t i
o h
2303-M27A/B Revision 1 12/01/77 are both scheduled on the Weekly Checklist Master Schedule, perform subsection 6.1 only.
If only 2303-M278 is scheduled perform subsection 6.2'only.
All of the steps in 6.2 are included
,. - -=
a n 6.1.
2.2 Modes
1 thru 4 - Testing required per ASME Section XI.
5 and 6 - Testing cptional per ASME Section XI.
3.0 LIMITS AND PRECAUTIONS 3.1 When a re erence value or set of values may have been affected by repair or routine servicing of the pump, a new reference value or set of values shall be determined, er the previous value reconfirmed by an inservice test run prior to or within 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> after return of the pump to normal service.
Deviations between the previous and new set of reference values shall be identified and verification that the new values represent acceptable pump operation shall be placed in the Technical Spec 1fications surveillance file for that pump.
3.2 fc. inservice test shall be run on each pump nominally each month during normal plant operation.
It is reccmmended that this test frequency be maintained during cold shutdown periods where this can reasonably be accomplished, altncugh this is not mandatory.
3.3 Pumps that are operated more frequently than every conth need not be run or stcpped for a special test provided the quantities specified were measured, observed, and analyzed.
3.4 All test data must be analyzed within 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> af ter test complet#on.
3.5 Searing temperatures are only recaired to be measured once every
'l hen measurement of bearing temperature is not required, year.
2.0 d ! h d ei 2_
~
2303-27A/B
]
Revision 3 05/04/78 each pump shall be run for at least five minutes under conditions as stable as the system permits.
At the end of this time at leasc one measurement of each of the quantities specified shall be made and recorded.
3.6 The vibration probe must be placed in the same position each test to insure repeatable measurements. ;
~
=~:
-; X.p - J
~
3.7 Record identification of the instruments used on the Data Sheet.
3.8 Instruments used for measuring quantities shall not have a scale range exceeding four times the reference value.
3.9 If a valve is in an out of service system, it naed not be exercised until immediately prior to return of the system to service.
3.10 After a valve or its control system has either been replaced, repaired, or has undergonc mintenance that could affect its performance, and prior to the time it is returned to service, it shall be tested as necessary to demonstrate that the performance parameters which could be affected are within acceptable limits. Adjustment of stem ~
~
' ~
packing; removal of the bonnet, stem assembly, or actuator; or disconnection of hydraulic or electrical lines are examples of maintenance that could affect valve performance parameters.
4.0 LOCATION OF SYSTEM 4.1 Emergency feedwater pumps are located in the Control m ;ilding Area, elevation 230'6".
4.2 Controls for the emergency feedwater pumps are located in Control Roca on Pane'. 4 Local controls are also available.
5.0 ECUIPMENT REOUIM_D 5.1 IRD Vibration Analyzer, !<odel 305, or equivalent.
5.2 Eagle Eye "eter, Model 77C, + 1.55 full scale, 0-50 inches of water or equivale.it.
3.0
<,.o L\\I L '
'g
2303-M27A/B Revision 3 05/04/78 5.3 Stopwatch - required only if 2303-M27A is scheduled.
6.0 PROCEDURE NOTE:
The following procedure c.ay be used for Motor Driven Emergency Feedpump 2A or 28.
Those components designations
=
. ~..._
in (parenthesis) refer to the B system.
NOTE:
Subsection 6.1 includes both valve and pump testing; subsection 6.2 includes pump testing only.
If 2303-M27A and 2303-M27B are both scheduled on the b'eekly Checklist Master Schedule, perform subsection 6.1 only.
If only 2303-M27B is scheduled perform subsection 6.2 only. All of the steps in 6.2 are included in 6.1.
Initial Each Step Af ter Satisfactory Completion.
6.1 Emergency Feed Pump (EF-P?A(B)) and valve test.
6.1.l' INSTALL Eagle Eye Meter or equivalent at CO-FE-7616 (7617).
6.1.2
?ERFORM Apperdix A (3) Valve Line up.
6.1.3 RECORD on Data Sheet A (3) the pump idle inlet pressure frca CO-PI-2025 (2026).
i.i."
- NSURE Proper lube oil level en pump from bearing sight glasses and INITIAL Data Sheet.
5.1.5 Frca its local control suitch, OPEN EF-V-27A(B) and tir.e frca ',9 hen the cpen button is pressed until ;nly the.ed open light is illuminated on the panel.
Record time on Data Sheet A(3).
6.1.6 CLOSE EF-V27A(3).
~
c n
i
&:,)
Lnn 4.0
'i 2303-M27A/B i
Revision 3 05/04/78 6.1.7-START EF-P-2A (B) from Panel 4.
6.1.8 INSURE EF-V27A (B) automatically opens.
6.1.9 THROTTLE OPEN EF-V39 (EF-V40) until the flow rate as indicated by the differential pressure across C0-FE-7616
~~
~
(7617) corresponds to the reference value.
The reference value is designated on the Data Sheet.
Calculate flow rate from the equation Q = 66.05 /AP where AP is the differential pressure across CO-FE-7616 (7617) in inches of water, and Q is in gpm.
6.1.10 Cooling water flow to floor drain indicates that check valves EF-VlA(B) opened as required.
Record on Data Sheet A(3) if valves EF-VlA(B) opened as required.
6.l.11 With pump EF-P-2A(3) operating as required, verify that
~
pump EF-P-23(A) is not windmilling due to fluid backflow _
through EF-VlB(A).
Record on Data Sheet B(A) that valves EF-Vl3(A) closed as required.
6.1.12 With pump EF-P-2A or EF-P-23 operating as required, verify that pump EF-?-l (steam driven EF pump) is not windmilling due to rluid backflow through EF-V2.
Record on Data Sheet A that valve EF-V2 closed as required.
6.1.13 LET pump run five minutes or longer until system stabilizes.
NOTE:
Perform the following two steps only the first
" e this test in run during each calendar year, since bearing temparature measurement is only required once each year.
5.0 g j (j g;c >
2303-M27A/B
^
Revision 3 05/04/78 6.1.14 ALLO'.1 EF-P-2A (28) to run until three successive bearing temperature measurements (as indicated by Computer Group 16, or Cc aputer points 1653 and 1654 '(1658 and 1659))
taken at 10 minute intervals, change by less than 3%.
6.1.15 RECORD on Data Sheet A (S) the bearing temperatures, and times taken.
RECORD the final temperatures in the table.
6.1.16 RECORD the pump running inlet pressure frcm C0-PI-2025 (2026).
6.1.17 RECORD the pump running discharge pressure from EF-PI-2002 (2001).
6.1.i8 CALCULATE and RECORD flow rate on Data Sheet A (B) using the equation Q = 66.05
/AP where aP is the D/P across CO-FE-7616 (7617) in inches of.iater, and Q is in gpm.
6.1.19 MEASURE and RECORD the pump inboard bearing vibration in the horizontal and vertical plane perpendicular to the rotating shaft.
INDICATE the higher of the two vibration amplitudes and designate whether in the horizonal (H) or vertical (V) plane.
INSURE the probe is on the designated est points.
4.1.20 STOP EF-P-2A (B).
t.l.21 REMOVE Eagle Eye Meter.
6.0 L: )
c 2303-M27A/B Revision 4 08/30/78 6.1.22 Insure EF-VSA(B) is open, EF-V12A(B) is open, EF-V7A(B)
~
is closed, and close EF-V39(EF-V40.
6.2 Emergency Feed Pump (EF-P2A(B)) Test.
6.2.1 INSTALL Eagle Eye Meter or equivalent at C0-FE-7616
~
.(7617).
~'
6.2.2 PERFORM Appendix A (B) Valve Line up.
__6.2.3 RECORD on Data Sheet A (B) the pump idle inlet pressure from CO-PI-2025 (2026).
6.2.4 INSURE Proper lube oil level on pump frca bearing sight glasses and INITIAL Data Sheet.
6.2.5 START EF-P-2A (B) from Panel 4.
6.2.6 INSURE EF-V27A (S) automatically opens.
6.2.7 THROTTLE EF-V39 (EF-V40) until the flo. rate as indicated by the differential pressure across CO-FE-7616 (7617) corresponds to the reference value.
The reference value is designated on the Data Sheet.
Calculate ficw rate from the equation Q = 66.05
,hP where AP is the differential pressure across C0-FE-7616 (7617) in inches of water, and Q is in gpm.
l
{s I
7.0
~
2303-M27A/S Eavisica 3 05/04/78 6.2.8 LET pump run five minutes or longer until system stabilizes.
f10TE:
Perform the following two steps only the first time this test in run during each calendar year, since bearing temperature measurement _ is
~ ^
'only required dnce each year.
6.2.9 ALLO'd EF-P-2A (2B) to run until three successive bearing temperature mea >;rements (as indicated by Ccmputer Group 16, or Computer points 1653 and 1654 (16ES and 1659))
taken at 10 minute intervals, change by less than 3%.
6.2.10 RECORD on Data Sheet A (B) the bearing temperatures, and times taken.
RECORD the final temperatures in the table.
6.2.11 RECORD the pumo running inlet pressure from C0-PI-2025 (202G).
6.2.12 RECORD the pump running discharge pressure from EF-PI-2002 (2001).
6.2.13 CALCULATE ard RECORD ficw rate on Data Sheet A (B) from the equation Q = 56.05
/iP where AP is the differential pressure across C0-FE-7616 (7617) in inches of water, and
- is in gpm.
5.2.i4 V.EA3URE and RECORD the pump inboard bearing vibration in the horizonal and vertical plane perpendicular to the rotating shaft.
IIiDICATE the higher of the tuo vibration amplitudes and designate whether in the horizonal (H) or vertical (V) plane.
IIISURE the probe is on the designated test points.
6.2.15 STOP EF-P-2A (B).
8.0 L;;}
'. *? ' )
r
2303-M27A/B Revision 4 08/30/78 6.2.16 REMOVE Eagle Eye Meter.
6.2.17 Insure EF-V3A(B) is open, EF-V12A(B) is open, EF-V7A(B; is closed, and close EF-V39 (EF-V40).
7.0 ACCEPTANCE CRITERIA 7.1 'If measuie~d va10~es' fall within the Acceptable Range, Analysis portion of the data sheet shall be filled out and signed by the Shif t Supervisor / Shift Foreman within 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br />.
7.2 If deviations fall within the Alert Range, the frequency of testing shall be doucled until the cause of the deviation is determined and the condition corrected.
Analysis portion of the data sheet shall be filled out and signed by the Lead Mechanical Engineer /ISI Coordinator within 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br />.
7.3 If deviations fall within the Requi ed Action Range, the pump shall be declared inoperative and not returned to service until the cause of the deviation has been determined and the condition corrected.
Analysis portion of the data sheet shall be filled out and signed by the Lead Mechanical Engineer /ISI Coordinator.
NOTE:
Correction can be replacement or repair or an analysis to demonstrate that the condition does not impair pump operability and that the pump will still fulfill its function.
A new set of reference values shall be established after such analysis.
NOTE:
Modes I thru 3 - Two motor driven emergency feedpumps OPERASLE per T.S. 3.7.1.2.
'a
[{
(. ' ' l 9.0 i
Kevision 3 d
05/04/78 NOTE:
If the acceptance criteria are not met, pro. eed with ACTION statement 3.7.1.2.
Each of the valves which has been tested to function, shall have 7.4 been observed to function as required on the data sheet.
If a valve fails to exhibit the required change of valve stem or disc 1..
position during the test, correcti7e action shall be initiated immediately. If the condition is not or can not be corrected within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, the valve shall be declared inoperative.
'l hen corrective action is required as a result of tests during cold shdtdown, the condition shall be corrected before startup.
A retest showing acceptable operation shall be run following any required corrective action before the valve is returned to service.
- 7. 5-When valve testing has been performed, the Analysis portion of the data sheet shall be filled out by the I.ead Mechanical Engineer /ISI Coordinator.
10.0
/. l
): s 'l mam w w mmmnwusmes m a w n w.u;sww w wx wwwxd
i i
2303-it27A/8 Revision 4 08/30/78 DATA SHEET A Motor Driven Emergency Feedpump EF-P-2A Functional Test 1.
Pump idle inlet pressure psig 2.
Pump running inlet pressure (6.1.16 or 6.2.11) psig 3.
Runp running discharge pressure (6.1.17 or 6.2.12) psig 4.
Calculate differential pressure (#3 - #2) psig 5.
Lube oil level (Initial if satisfactory) 6.
Pump Inboard Bearing Vibration (mils)
H V
l REQUIRED ACTION jMEASUPED ACCEPTABLE ALERT RANGE rat:GE REFEREi!CE QUANTITY VAll RAi'GE LOW HIGH LOW l HIGH VALUE PU:P IDLE I
INLET PRESS.
l (PSIG)
>i.8 NA NA 18 lNA 7
150 g
e i
PUMP RUNNING I
IllLET PRESS.
(PSIG) l
>7.8 NA NA 718 NA 145 PU P DIFF.
1269 1228 1392 !
i PRESSURE to to to j<l228
>l405 1355 (PSI) j 1392 1269 1405 l t
l l
1 i
FLON RATE 117.5 112.5i 127.54 (GPM) to to to j<112.5. >l28.75 125 127.5 117.5 128.75 I
PUMP INSOARD t
350) '
<180 NA NA NA l >l80 (r
91.3 i
PU:P CUTSOARD i
SgARINGTEMP.
<180 NA NA
( F)
{MA
->l80 109.9 l1AX VIERATIONt 0.0 t
i l.01 (MILS) to l
f
>to '
l i
1.0 i
NA i
1.5 l NA i
>1.5 i
.15 V
+
- Measurements taken only during first test run each calendar year.
11.0
- r*
[jg bl t /
2303-M27A/B lk Revision l 12/01/77 DATA SHEET A (Cont'd)
Bearing Temperatures NOTE:
- To be ceasured yearly.
_ TIME INBOARD BEARING TEMP.
OUTBOARD BEARING TEMP.
TE:
Three consecutive measurements taken at 10 minute intervals must change by less then 3%.
3q 12.0
$ /
/-
e
~
2303-M27A/3 Revision 3 DATA SHEET A (cont'd)
EAGLE EfE VIERATICN C0-PI-2025 EF-PI-2002 C0-FE-7616 METER INSTRUMENT MANUFACTURE MODEL
~ SERIAL NO.
l~
' " ~ ~ ~ ~
SCALE RANGE PERFORMED BY:
DATE:
TIME:
APPROVED SY:
DATE:
Valve No.
Stroke Time (sec)
Acceptance Criteria EF-V27A CPEN in 13 sec.
Valve No.
Valve Function Reauirement Date/ Initial EF-V1 A (check valve) OPEN EF-VlB (check valve) CLOSED EF-V2 (check valve) CLOSED PERFORMED BY:
DATE:
APPROVED BY:
DATE:
ANALYSIS:
Analysis by:
DATE:
TIME:
Analysis performed within 95 hours0.0011 days <br />0.0264 hours <br />1.570767e-4 weeks <br />3.61475e-5 months <br />?
Yes No 13.0 c.
'c L
i
(.
2303-ti27A/8 Revision 4 08/30/78 DATA SHEET B Motor Driven Emergency Feedpump EF-P-2B Functional Test 1.
Pump idle inlet pressure psig
- 2. ~ Pum[runninginletpressure(6.1.16or6.2.11) psig 3.
Pump running discharge pressure (6.1.17 or 6.2.12) psig 4.
Calculate differential pressure (#3 - #2) psig 5.
Lube oil level (Initial if satisfactory) 6.
Pump Inboard Bearing Vibration (mils)
H V
REQUIRED ACTION MEASURED ACCEPTABLE ALERT RANGE RANGE REFERENCE QUANTITY VALUE RANGE LOW HIGH LCW H'GH VALUE PUMP IDLE INLET PRESS.
(PSIG)
>7.8 NA flA 5.7. 8 NA 148.
j PUMP RUNNING ItiLET PRESS.
(PcIG)
>7.8 NA NA 5.7. 8 NA 144 PUMP DIFF.
1279 1238 1403 PRESSURE to to to
<1233
>1417 1376 (PSI) 1403 1279 1417 117.5 112.5 127.5 1
FLOW RATE l'
to to I to l <l12.5
>128.75 125.3 (GPM) 127.5 117.5 128.75 l
PUMP It.3JARD SgARINGTEMP.
<180 NA NA NA
>180 114
( F)
PUMP UUiBOARD SgARINGTEMP.
<180 NA NA NA
>180 96.6
( F) l,
MAX VIBRATIO4 0 to 1 NA
>l tc NA i >l.5
.32V (MILS) 1.5 I
- Measurements taken only during first test run each calendar year.
'g 5 !+
,i O
/
[
n 14.0
"'p+-
-ewe.-
e
-.e---ems =,
2303-M27A/B N
Revision 1 12/01/77 DATA SHEET B (Cont'd)
Bearing Temperatures
~
f[0TE:
To be measured yearly.
~
~ ~
TIME II;30ARD BEARI:lG TEMP.
OUTBOARD BEARI!1G TEMP.
.iOTE:
Three consecutive measurements taken at 10 minute intervals cast change by less then 3".
15.0
,c.,
c,)
(. s v E
2303-M27A/B Revision 3 DATA SHEET B (Cont'd)
EAGLE EYE VIBRATION CO-PI-2026 EF-PI-2001 CO-FE-7617 METER INSTRUMENT FMNUFACTURE F.0 DEL
- --.-SERIAL NO. ~
~ ~ ~ ~ ' ~ ~
~ ' - ~ ~ " "
~
~
SCALE RANGE PERFOR:!ED BY:
DATE:
TIME:
APPROVED BY:
DATE:
Valve "o.
Stroke Time (sec.)
Acceptance Criteria EF-V273 OPEN in
< 3 sec.
Valve No.
Valve Function Requirement Date/ Initial EF-Vi B (check valve) OPEN _
EF-VlA (check valve) CLOSED PERFOR.9ED BY:
CATE:
APPROVED BY:
DATE:
A"A
- 3:
Ana'iysis by:
DATE:
TIME:
Analysis performed within 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br />?
Yes No 16.0 g,y
(_;,)
c-va.-onja Revision 4 08/30/78
~
APPE?: DIX A Motor Driven Emergency Feedpump, EF-P-2A Recirculation Valve Line-Up Valve Description Po';i t io n Initial CO-V35 Iso Valve on Header from Cond. Pumps OP C0-V82A Iso Valve frcc Cond. Storage Tanks OP C0-V83A Suction to EF-P-2A L.0.
EF-V 7.1 EF-P-2A Recirc tc Cord.
OP EF-VSA EF-P-2A Recirc. to CO-T-1A CL EF-V9 CO-T-1A isolation valve OP CD-V98A EF Sucticn from CO-T-1A OP C0-V9P3 EF Suction From CO-T-1B CP CD-V87 EF Pum;s Suct Hdr Block OP EF-VilA Emerg. F.W. to RC-H-1A CL EF-V12A Emerg. F.U. to RC-H-1A CL EF-V32A EF-VilA Sypass CL EF-V33A EF-V12A Sypass CL EF-V29A EF-P-2A Cooling Water Inlet OP EF-V3il 3 earing cooling water cutlet OP EF-VilB Emerg. F.W. to RC-H-1B CL EF-V125 Emerg. F.U. to RC-H-1B C
EF-V323 EF-VilS Sypass CL EF-V333 EF-V123 Bypass CL c
L, 'I 1J'
.ee-
= = = -
=
i
?
2303-M27A/B Revision 4
~
03/30/78 APPENDIX B Motor Driven Emergency Feedpump, EF-P-23 Recirculation Valve Line-Up Valve Description
_.Positian Initial CO-V85 Iso Valve on Header from Cond. Pumps OP C0-V82B Iso Valve frcm Cond. Storage Tanks OP C0-VB33 Suction to EF-P-23 L.O.
EF-V78 EF-P-23 Recirc to Cond.
CP EF-V83 EF-P-2B Recirc. to CO-T-1A CL EF-V9 C0-T-1B isolation valve OP C0-V98A EF Suction from CO-T-1A OP CO-V95B EF Suction From CO-T-18 OP CO-V87 EF Pumps Suct Hdr Block OP EF-VilA Emerg. F.M. to RC-H-1A CL EF-V12A Emerg. F.W. to RC-H-1A CL EF-V32A EF-VilA Sypass CL EF-V33A EF-V12A Sypass CL EF-V293 EF-P-23 Cooling ;!ater Inlet OP EF-V318 Cooling <3ter outlet OP EF-ViiB Emerg. F.W. to RC-H-1B CL EF-V123 Emerg. F.W. to RC-H-1B CL EF-V323 EF-Vll3 Sypass CL EF-V338 EF-V123 Sypass CL g ; 'l
/. a U 18.0
__