ML19224A244

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-320/78-28 on 780905-07.No Noncompliance Noted
ML19224A244
Person / Time
Site: Crane Constellation icon.png
Issue date: 09/21/1978
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Herbein J
METROPOLITAN EDISON CO.
Shared Package
ML19224A246 List:
References
NUDOCS 7811090284
Download: ML19224A244 (2)


See also: IR 05000320/1978028

Text

I,

_

C4ARAL N

._

.

UNITED STATES

.t * % t

NUCLEAR REGULATORY COMMisslON

,

..g

.

y

REGION I

] ' j,,

's

en#

$31 P ARK AVENUE

O,

b,, a

KgNG OF PRUSSI A. PENNSYLV ANI A 19406

%,

' S

. . . .

. ...

SEP 211978

.

Docket No. 50-320

Metropolitan Edison Company

ATTN: Mr. J. G. Herbein

Vice President - Generation

P. O. Box 542

Reading, Pennsylvania 19603

Gentlemen:

Subject:

Inspection 50-320/78-28

This refers to the inspection conducted by Mr. D. Haverkamp of this

office on September 5-7, 1978 at Three Mile Island Nuclear Station, Unit

2, Middletown, Pennsylvania, of activities authorized by NRC License No.

DPR-73 and to the discussions of our findings held by Mr. Haverkamp with

Mr. J. Seelinger and other member of your staff at the conclusion of the

inspection.

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with this

letter. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

If this report contains any information that you (or your contractor)

Room.

believe to be proprietary, it is necessary that you make a written

application within 20 days to this office to withhold such information

from public disclosure. Any such application must be accompanied by an

affidavit executed by the owner of the information, which identifies the

' document or part sought to be withheld, and which contains a statement

of reasons which addresses with specificity the items which will be

considered Ny the Commission as listed in subparagraph (b)(4) of Section

2.790. The information sought to be withheld shall be incorporated as

far as possible into a separate part of the affidavit.

If we do not

hear from you in this regard within the specified period, the report

will be placed in the Public Document Room.

gencoJo d

'

i

$D

l

2.130

.

_

_

,

SEP 211978

Metropolitan Edison Company

2

.

No reply to this letter is required; however, if you should have any

questions concerning this inspection, we will be pleased to discuss them

wi th you.

Sincerely,

cel og

Brunner Chief

Reactor Operations and Nuclear

Su'pport Branch

Enclosure: Office of Inspection and Enforcement Inspection Report

Number 50-320/78-28

cc w/ enc 1:

T. Broughton, Safety and Licensing Manager

J. J. Barton, Project Manager

R. C. Arnold, Vice President - Generation

L. L. Lawyer, Manager - Generation Operations - Nuclear

G. P. Miller, Superintendent

J. L. Seelinger, Unit 2 Superintendent - Technical Support

I. R. Finfrock, Jr.

Mr. R. Conrad

G. F. Trowbridge, Esquire

Miss Mary V. Southard, Chairman, Citizens for a Safe Environment

(Without Report)

.

!

2.111

i