ML19224A038

From kanterella
Jump to navigation Jump to search

Units 1 and 2 - Correction Letter to License Amendment Nos. 316 and 295 Correct Editorial Error in Technical Specification Surveillance Requirement 3.0.5 and Remove Expired Footnotes
ML19224A038
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 08/26/2019
From: Michael Mahoney
Plant Licensing Branch II
To: Teresa Ray
Duke Energy Carolinas
Mahoney M, NRR/DORL/LPL2-1, 415-3867
References
EPID L-2019-LLA-0022
Download: ML19224A038 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 26, 2019 Mr. Thomas D. Ray Site Vice President McGuire Nuclear Station Duke Energy Carolinas, LLC 12700 Hagers Ferry Road Huntersville, NC 28078-8985

SUBJECT:

MCGUIRE NUCLEAR STATION, UNITS 1 AND 2 - CORRECTION LETTER TO LICENSE AMENDMENT NOS. 316 AND 295 RE: CORRECT EDITORIAL ERROR IN TECHNICAL SPECIFICATION SURVEILLANCE REQUIREMENT 3.0.5 AND REMOVE EXPIRED FOOTNOTES FROM TS 3.5.2, 3.6.6, 3.7.5, 3.7.6, 3.7.7, 3.7.9, 3.7.11, 3.8.1, AND 3.8.4 (EPID L-2019-LLA-0022)

Dear Mr. Ray:

By letter dated August 8, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19184A585), the U.S. Nuclear Regulatory Commission (NRC) issued Amendment Nos. 316 and 295 to Renewed Facility Operating License Nos. NPF-9 and NPF-17 for the McGuire Nuclear Station (McGuire), Units 1 and 2, respectively. The amendments changed the Technical Specifications (TS) in response to Duke Energy Carolinas application dated February 5, 2019.

The amendments corrected an editorial error in Section TS 3.0, "SR [Surveillance Requirement]

APPLICABILITY," specifically, SR 3.0.5. The amendments also modified TS 3.5.2, " ECCS

[Emergency Core Cooling System] - Operating," TS 3.6.6, "Containment Spray System," TS 3.7.5, "Auxiliary Feedwater (AFW) System," TS 3.7.6, "Component Cooling Water (CCW)

System," TS 3.7.7, "Nuclear Service Water System (NSWS)," TS 3.7.9, "Control Room Area Ventilation System (CRAVS)," TS 3.7.11, "Auxiliary Building Filtered Ventilation Exhaust System (ABFVES)," TS 3.8.1, "AC [Alternating Current] Sources - Operating," and TS 3.8.4, "DC [Direct Current] Sources - Operating" to remove expired TS footnotes.

Subsequent to the issuance of the amendments, the NRC staff discovered a typographical error on TS 3.8.4-1. The footer of page TS 3.8.4-1 was issued with "License Amendment Nos.

314/295," and it should have read "License Amendment Nos. 316/295." This error is administrative in nature and correcting it does not affect the safety evaluation for Amendment Nos. 316 and 295.

Enclosed is the revised the TS 3.8.4-1 page. Please replace the corresponding page issued by Amendment Nos. 316 and 295 for McGuire, Units 1 and 2.

T. Ray If you have any questions regarding this matter, I may be reached at (301) 415-3867 or via e-mail at Michael.Mahoney@nrc.gov.

ichael Mahoney, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-369 and 50-370

Enclosure:

Revised Technical Specification Page cc: Listserv

ENCLOSURE DUKE ENERGY CAROLINAS, LLC MCGUIRE NUCLEAR STATION, UNITS 1 AND 2 REPLACEMENT TS PAGE FOR AMENDMENT NOS. 316 AND 295 DOCKET NOS. 50-369 AND 50-370

DC Sources - Operating 3.8.4 3.8 ELECTRICAL POWER SYSTEMS 3.8.4 DC Sources- Operating LCO 3.8.4 The four channels of DC sources shall be OPERABLE.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One channel of DC A.1 Restore channel of DC 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> source inoperable. source to OPERABLE status.

OR A.2.1 Verify associated bus tie 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> breakers are closed between DC channels.

AND A.2.2 Restore channel of DC 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> source to OPERABLE status.

B. Required Action and 8.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Associated Completion Time not met. AND B.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> McGuire Units 1 and 2 3.8.4-1 Amendment Nos. 316/295

ML19224A038 OFFICE NRR/DORL/LPL2-1 /PM NRR/DORL/LPL2-1/LAit NRR/DORL/LPL2-1 /LA NAME MMahoney KEntz KGoldstein DATE 08/19/19 08/12/19 08/15/19 OFFICE NRR/DORL/LPL2-1 /BC NRR/DORL/LPL2-1 /PM NAME MMarkley MMahoney DATE 08/26/19 08/26/19