ML19221A202

From kanterella
Jump to navigation Jump to search
Master Test Index,Revision 0,for Unit Recovery
ML19221A202
Person / Time
Site: Crane 
Issue date: 04/25/1979
From: Toole R
Metropolitan Edison Co
To:
References
NUDOCS 7905210009
Download: ML19221A202 (13)


Text

j'j[,h G! (

2-p'

D is s vu
  • he

~

o

_,Y i -

/

1,g.

TMI UNIT 2 RECOVERY MASTER TEST INDEX (MTX)

Revision 0 Prepared by:

R.

J.

~aole

(,.<;"et-Ed St

-t-up t, -..s:

  • ,-il ?5, li-7 9 1

140 10 7905210 0 0 7

?

Cs

~

=

Y

~

Dil - UNIT 2 - RECOVERY INDEX TO MTX (by task designation)

MTX Sistem B6R Print TS-3C Long Term Cool Down System - OTSG "B"

TS-3D Long Term Cool Down System -0TSG "A" TS-6B RCS Passive Pressure Control System TS-10/11 Diesel. Generators / Distribution System TS-15 Auxilliary Decay Heat Removal System UG-1 Auxilliary & F. H. Bldg. HVAC WG-2 CAPCUN Ion Exchange Process System WO-6 Fuel Fool Waste Storage WG-11 Water Chemistry Laboratory (for CAPGUN)

WG-12 Modified Decay Heat Vaults Ventilation System SK.WC-12-HV-1

/

1063 Cendenser Air Extraction Filtration System a

.1 TMI UNIT 2 RECOVERY - MTX MTX System B&R Print TS-3C Lone Term Cool Dcwn System - OTSG "B"

Instrrentation Calibration Electrical Test Flush - Class "C" Presstre Test Pre-operatientl Test O

h

=

a e

140 151

Y TMI l' NIT 2 RECOVERY - MTX MTX System B&R Print TS-3D Long Tern Cool Dom System - OTSG "A" Instrumentation Clabration Electrical Test Pressure Test Flush - Class "C" Pre-operational Iest 9

9

/

p e

e 140 152 9

e

Y TMI UNIT 2 RECOVERY - MTX MTX Systet B&R Pri_n_t TS-6B RCS Passive Pressure Control System Instru=entation Calibration Electrical Test Flush - Class "B" Pressure Test Pre-operational Test e

9

~

140 153

=

TMI UNIT 2 RECOVERY u.TX MTX Svsten B&R Print TS-10/11 Diesel Generators / Distribution System 1.

Fuel Oil System Pre-op rational Test A.

Inspect fuel oil tanks.

Confirm with diesels vendor rep.

B.

Fill storage tanks with diesel oil.

C.

Vendor run.

Fuel oil pumps installed in diesel housing and check.

2.

Lubricating Oil Pre-ope _rional Test A.

Fill both diesel pumps with lube oil.

B.

Check lube oil pu=ps with vendor.

3.

Cooline Water Svstem A.

Check that cooli.ng water system is flushed.

B.

Check that rust inhibitor is added.

D 4.

Electrical Test A.

Modify condensate pump booster pump breakers for elec. feed to diesel aux.

B.

Checkout cond-booster pump breakers & back feed the buses from DC-A & DB-3.

C.

Checkout DC-A & DC-B auxiliaries & battery charger.

9 D.

Kun diesel generators & synchronize t: bus.

E.

Check diesels with Power loss to 2-3 & 2-4 S ~r' G R 5.

Cire. water Fouse A.

Ch-ck cut the cire, water pu.p areaker interlacks for 13. 2 kv line.

rtire 13.2 kv trrmsfo:-ar-3.

C.

= -rgine 2-5, with mw 13.2 r:'

line

,d run a cire.

a er p

.? on 'rus 2-5 D.

Energize 2-6 with new 13. 2 r:w 11.e

.d run a circ. 'ater p.

p en 'us 2-6.

140 154 e

TMI UNIT 2 RECOVERY - MTX MTX System B&R Print TS-15 Auxiliary Decay Heat Removal Svstem Electrical Test Ins t rumen ta tion Calib ra tions Flush - Class "B" Pressure Test Pre-operational Test e

e

/

e a

V Y e

e TMI U?;IT 2 RECOVERY - ?!TX MTX System B&R Print

'W C-1 Aux & F.H. Bldg. HVAC 1.

HVAC Fan Units 1 6 2 Electrical Test Pre-Operational Test MSA - Efficiency Test Inst ru=entation Calibration Radiation Monitors Calibration 2.

HVAC Fan Units 3 & 4 Electrical Test Pre-Operational Test MSA - Efficiency Test Inst rumentation Calibratica Radiation Monitors Calibration

/

3.

Fire Se rvice - All Fan Units Flu sh - Cla ss "D" Hydrostatic Test - lb Times designed (225 psig) e

\\

9 e

2 TMI UNIT 2 RECOVERY - tf"X MIT System B&R Print WG-2 CAFGUN Ion Exchange. Process Syste=

1.

Hoist Electrical Test Pre-Operational Test - Factory Rep.

2.

HVAC Electrical Test Pre-Operational, MSA - Efficiency Test Instrumentation Calibration 3.

SA Flush - Class "C" Hydrostatic - Operational 4.

D'd

/

Flush - Class "C" Hydrostatic - Operational 5.

P r oc e s s/ S ump Flush - Class "C"

' ydrostat ic Test Pre-Operatienal Test

,t re. n tat ien Calib ra tion E:rct rical Tast 0 ::d ' a t ion "2a i ter c Ca lib r a t ion

-y

, e s t i. e,

}

6.

e

T TMI ITNIT 2 RECOVERY - MTX MIX System B6R Print UG-6 Fuel Pool Waste Storagt System Flush - Class "C" Hydrostatic Test-Operational Hydrostatic Test-Pneumatic Pre-Op Instrumentation Calibration Electrical Test

/

r 140 158

~

m e

s DiI UNIT 2 RE' OWRY - MTX MTX hs te:s B&R Print W-ll Water Chemistrv Laboartorv (for CAPGUN)

Flush Hydrostatic Test I

e

/

140 159 o

TMI L731T 2 RECOVERY - MTX MTX System B&R Print WC-12 Modified Decay Heat Vaults Ventilation System SK.WG-12-HV-1 Electrical Test Instrumentation Calibration Pre-operational Test

/

9 9

h.

j 4()

\\ U-i m

Y TMI U'1IT 2 RECOVERY - MTX MTX System B&R Print 1063 Condenser Air Extraction Filtration System Electrical Test Instrument Calibration Pre-operation Test Hydrostatic Test - Opera tional Flush - Class "D" s

Filter Efficiendy Test (by AAF)

/

9 O

.