ML19220C769

From kanterella
Jump to navigation Jump to search
Ack Receipt of Final Rept Re Protection Sys Bypass Indication.Matter Will Be Reviewed During Subsequent Insp
ML19220C769
Person / Time
Site: Crane Constellation icon.png
Issue date: 07/18/1977
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Herbein J
METROPOLITAN EDISON CO.
Shared Package
ML19220C770 List:
References
NUDOCS 7905140256
Download: ML19220C769 (1)


Text

CEp7 Ant t=IG1

~

j# "

f UNITED STATES 4

7~

NUCLEAR REGULATORY COMMIS',10N f Y )

  • 6N *S REClON 1 T,

- f

$31 s ARK AVENUE 4,

KING or PRusst A PENN5Yt.,V AN. A 19406

'+9....

Docket No.

50-320 jgtig1977 Metropolitan Edison Ccmpany ATTN:

Mr. J. G. Herbein Vice President P. O. Box 542 Reading, PA 19603 Gentlemen:

Subject:

Protection System Bypass Indication (Your letter of June 24,1977)

Thank you for your letter, referenced above, which forwarded a final report pursuant to 10 CFR 50.55(e) regarding the subject matter.

This matter will be reviewed during a subsequent inspection.

Your cooperation with us is appreciated.

Sincerely,

/

o s

Robert T. Carlson, Chief leactor Construction and Engineering Support Branch cc:

R. L. Wayne, QA Manager, Design and Construction T. M. Crimmins, Jr., Safety & Licensing Manager R. W. Heward, Jr., Project Manager R. C. Arnold, Vice President, Design & Construction Gerald Charnoff, Esquire Miss Mary V. Southard, Chairman Citizens for a Safe Environment no

\\00

~

.5

)

l' Y j-TMN C

7005140R5(

C.

,