Thirty-day Followup Re Protection Sys Bypass Indication. Pressure Switches on Instrument Racks Have Manually Operated Isolation Valves Which Have No Position Indication. Applicable FSAR Pages Will Be Clarified
ML19220C775
Person / Time
Site: Crane Constellation icon.png
Issue date: 06/24/1977
From: Herbein J
Metropolitan Edison Co
To: O'Reilly J
NRC Office of Inspection & Enforcement (IE Region II)
Shared Package
ML19220C770 List:
References
NUDOCS 7905140266
Download: ML19220C775 (2)


Text

f) / - / C /1.

f

/

ics f-gg E

4,h 1

M ETRO PO LITAN E D I SO N CO M PA N Y susswis a r ce cenenavveuc unune: ccapona ncu PCST OFFICE Box 542 REACING, PENNSYLVANI A 196C3 TELEPHONE 215 - 929-36o1 June 2h, 1977 GQC,088h Mr. J. P. O ' PJ!il17 s Director U.S. Nuclear Regulatory Coi: mission Office of Inspection & Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania 19406

Dear Sir:

Three Mile Island Nelear Station Unit 2 (TMI-2)

Licuac No. CPPR-66 DocFet No. 50-320 Protection System Bypass Indication

(

h May 26, 1977, Mr. Lou Narrow of your office was verbally notified of a situati which Metropolitan Edison Conpany considered to be reportable in accordance with the require =ents of 10CFR50.55(e).

This letter constitutes the required thirty-day fo11cv-up letter.

Descriotion Section 7, Paragraph 7.3.2.1.m of the FSAR (Indication of Bypasses) requires that when any Control or Protection System channel or portion of a channel is bypassed or defeated by =anual switch or valve action, the condition will he continuously indicated and alar =ed in the Control Room.

The pressure switches on instru=ent racks 452, 455, 467 and 472 for Reactor Building Spray, Isolation, and Cooling System have ~n

"'lly operated isolation valves that have no position indication. These valves are used to test the actuation of the pressure switches and effectively defeat the operation of the pressure switches without providing indication or alarm in the Control Room.

Analysis of Safety Inclications The discrepancy between the FSAR and actual plant design has been reviewed.

All of these valves are located in enclosed locked racks.

The FSAR indicates that

"... The unauthorized actuation of c bnnel bypassing devices vill be prohibited by ad-inistrative operating instructions..." The existing as-built plant con-figuration is in accordance with the design, but the FSAR does not clearly repre-sent the design in this regard.

For this reason, there is no adverse effect on the health or safety of the public or plant staff.

T

}O0 2 3J 7905140:$ 5

.c. J. P. O'Reilly June 24, 19(7 GQL 088h Corrective Action The applicable 7SAR pages vill be further clarified to depict the existing desig..

The revised pages vill be subnitted with the next anend=ent to the FSAR.

Very truly yours.

J. G. Herbein Vice President cc: Dr.Ernst Volgenau, Director-Office of Ir.spection & Enforcement U.S. Nuclear Regulatory Cecmission Washington, D. C.

20555 1

-