Forwards IE Insp Rept 50-320/77-22 on 770602.No Noncompliance Noted
ML19220C350
Person / Time
Site: Crane Constellation icon.png
Issue date: 06/29/1977
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Herbein J
METROPOLITAN EDISON CO.
Shared Package
ML19220C351 List:
References
NUDOCS 7904300464
Download: ML19220C350 (2)


See also: IR 05000320/1977022

Text

.

.y

-

-

,

cfrJTAAL fK5S

cf

k

UNITED STATES

f.k

'

NUCLE A R R EGULATOR Y COMM!sslON

.

8

I"

.

REGION I

g

s31 P ARK AVENUE

8

[

4G OF PRU558A. PENN5YLV ant A 19406

,

t

....*

June 29, 1977

Occket No. 50-320

Metropolitan Edison Ccmpany

ATTN: Mr. J. G. Herbein

.

Vice President

'

P. O. Box 542

Reading, PA 19603

Gentlemen:

Subject:

Inspection 50-320/77-22

This refers to the inspection conducted by Mr. A. Finkal of this office

on June 2,1977 at Burns and Roe, Incorporated, Oradell, New Jersey

office, of activities relating to your application for an NRC Construc-

tion Permit, and to the discussions of our findings held by Mr. Finkel

with Mr. J. Torcivia of General Public Utilities Service Corporation at

the conclusion of the inspection.

Areas examined during this inspection are described in the Office of

Inspectico and Enforcement Inspection Report which is enclosed with this

letter.

Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your con-

tractor) believe to be proprietary, it is necessary that you make a

written application within 20 days to this office to withhold such

information from public disclosure. Any such application must be accom-

panied by an affidavit executed by the owner of the information, which

identifies the document or part sought to be withheld, and which con-

tains a statement of reasons which addresses with specificity the items

which will be considered by the Comission as listed in subparagraph

(b)(4) of Section.2.790.

The information sought to be withheld shall be

(

n,=

g;

,.

ed.

g

-

'

7 90430 0 VU/

V

3

p L(%

q)

.

-

-

_

.

Metropolitan Edison Company

2

.

.

.

incorporated as far as possible into a separate part of the affidavit.

If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

No reply to this letter is required; however, should you have any ques-

tions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

AW

_

,

Robert T. Carlson, Chief

Reactor Construction and Engineering

Support Branch

Enclosure: Office of Inspection and Enforcement Inspection Report

Number 50-320/77-22

cc w/ enc 1:

R. L. Wayne, QA Manager, Design and Construction

l

T. M. Crimmins, Jr., Safety & Licensing Manager

R. W. Heward, Jr., Project Manager