Forwards IE Insp Rept 50-320/78-17 on 780503-10.No Noncompliance Noted
ML19220C327
Person / Time
Site: Crane  Constellation icon.png
Issue date: 05/31/1978
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Herbein J
METROPOLITAN EDISON CO.
Shared Package
ML19220C328 List:
References
NUDOCS 7904300410
Download: ML19220C327 (2)


See also: IR 05000320/1978017

Text

O

_

Qfi%'/%

..

,

UNITED STATES

M

h" "IGut ,

t

NUCLEAR REGULATORY COMMisslON

+

aEclON I

't

,e/

E

,

',

$31 P ARK AVENUE

g.

y

'li y

xiNo or Paussi A. PENN5VLV ANI A 19406

g v [f

o.,

,

p

a

  • .. <

-

MAY 311978

50-320/7g./7

Docket No.

Metropolitan Edison Company

ATTN: Mr. J. G. Herbein-

Vice President

P. O. Box 542

Reading, Pennsylvania 19603

Gentlemen:

Subject: Inspection 50-320/78-17

I

This refers to the inspection conducted by Mr. D. Haverkamp of this

office on May 3-5 and 8-10,1978, at the Three Mile Island Nuclear

Station, Unit 2, Middletown, Pennsylvan!a, of activities authorized by

NRC License No. DPR-73 and to the discussions of our findings held by

Mr. Haverkamp with Mr. J. Seelinger of your staff at the conclusion of

the inspection.

Areas examined during tnis inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with this

Within these areas, the inspection consisted of selective

letter.

examinations of procedures and representative records, interviews with

personnel, measurements made by the inspector, and observattons by the

inspector.

Within the scope of this inspection, no items of noncompliance were

observed.

In accordance with Section 2.790 of the NRC's " Rules of practice " Part

2, Title 10, Ccde of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

If this report contains any infomation that you (or your contractor)

Room.

beliave to be proprietary, it is necessary that you make a written

application within 20 days to this office to withhold such iaformation

from put,lic disclosure. Any such application must be accompanied by an

affidavit executed by the owner of the information, which identifies the

document or part sought to be withheld, and which contains a statement

of reasons which addresses with specificity the items which will be

considered by the Commission as listed in subparagraph (5)(4) of Section

The infomation sought to be withheld shall be inorporated as

2.790.

If we do not

far as possible into a separate part of the affidavit.

hear from you in this regard within the specified period, the caport

(

will be placed in the Public Document Rocm.

@

o i

c, ., q

-

nm

oL

7SO430 cd tc)

.

(

.

.

_

,

.

Metropolitan Edison Company

2

No reply to this letter is required; however, if you should have any

questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

-

6

-

Eld n J. Brunner, Chief

Reactor Operations and Nuclear

Support Branch

Enclosure: Office of Inspection and Enforcement Inspection Report

Number 50-320/78-17

,

cc w/ encl:

R. L. Wayne, QA Manager, Design & Construction

T. Broughton, Safety & Licensing Manager

R. W. Heward, Jr. , Project Manager

R. C. Arnold, Vice President, Generation

'

L. L. Lawyer, Manager, Generation Operations - Nuclear

G. P. Miller, Superintendent

J. L Seelinger, Unit 2 Superintendent

Gerald Charnoff, Esquire

I. R. Finfrock, Jr.

Miss Mary V. Southard, Chairman, Citizens for a Safe Environment

(WithoutReport)