ML19220C290

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-320/77-20 on 770523-26.No Noncompliance Noted
ML19220C290
Person / Time
Site: Crane Constellation icon.png
Issue date: 06/07/1977
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Herbein J
METROPOLITAN EDISON CO.
Shared Package
ML19220C291 List:
References
NUDOCS 7904300144
Download: ML19220C290 (2)


See also: IR 05000320/1977020

Text

.

.s

-

-

.

'

(ggg AW

.

[

UNITED STATES

4

NUCLEAR REGULATORY COMMisslON

hI

E

REGION I

-

c*

f

$31 PARK AVENUE

D

E

AING OF PRUSSI A, PENNSYLV ANI A 19405

+

.

  • " * *

June 7, 1977

,

Docket No. 50-320

Metropolitan Edison Company

ATTN: Mr. J. G. Herbein

Vice President

P. O. Box 542

Reading, PA 19603

Gentlemen:

Subject: Inspection 50-320/77-20

This refers to the inspection conducted by Mr. L. Narrow of this office

on May 23-26, 1977, at Middletown, Pennsylvania, of activities authorized

by NRC License No. CPPR-66, and to the discussions of our findings held

by Mr. Narrow with Mr. S. Levin and other members of your' staff at the

_

conclusion of the inspection.

-

'

Areas examined during this' inspection are described in the Office of

(

Inspection and Enforcement Inspection Report which is enclosed with this

letter. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part

2, Title 10, Code of Federa1 Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any infonnation that you (or your contractor)

believe to be proprietary, it is necessary that you make a written

application within 20 days to this office to withhold such infonnation

from public disclosure. Any such application must be accompanied by an

affidavit executed by the owner of the information, which identifies the

document or part sought to be withheld, and which contains a statement

of reasons which addresses with specificity the items which will be

considered by the Comission as listed in subparagraph (b) (4) of Section

2.790. The infornation sought to be withheld shall be incorporated as

far as possible into a separate part of the affidavit.

If we do not

hear from you in this regard within the specified period, the report

will be placed in the Public Document Room.

I

1O

nq

1

07

Ii/

g

_

O~

7 9 0 4 3 0 0177 'h,4

w

m

..

_

_

.

.

Metropolitan Edison Company

2

_

No reply to this letter is required; however, should you have any questions

-

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

.

-

.

_,

h

o ert T. Carlson, Chief

Reactor Construction and Engineering

Support Branch

Enclosure: Office of Inspection and Enforcement Inspection

Report Number 50-320/77-20

cc w/ encl:

R. L. Wayne, QA Manager, Design and Construction

T. M. Crimmins, Jr., Safety & Licensing Manager

R. W. Heward, Jr., Project Manager

R. C. Arnold, Vice President, Design & Construction

Gerald Charnoff, Esquire

Miss Mary V. Southard, Chairman Citizens for a Safe Environment

(Without Report)

.

'

SS

i20

-

,

.

w