ML19220B835

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 79-06A, Review of Operational Errors & Sys Misalignments Identified During TMI Incident
ML19220B835
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 04/14/1979
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
References
NUDOCS 7904270444
Download: ML19220B835 (1)


Text

.

r[ ATAAL FILb5 UNITED ST ATES t * * " %,

[,,

I NUCLEAR REGULATORY COMMisslON p

y REGION I i % > 'r QS "5

631 P AR K AVENUC 19406 KtNG OF PRUSSI A. PENNSYLV ANI A

.. KS@[p g

f y....,

Docket No. 50-320 SEP 19 M7 Metropolitan Edison Company ATTH: Mr. J. G. Herbein Vice President P. O. Box 542 Reading, PA 19603 Gentlemen:

Subject:

Inspection 50-320/77-35 This refers to the inspection conducted by Mr. L. N authorized by NRC License No. CPPR-66 and to the discussions of our findings held by Mr. Narrow with Mr. Heward and uthe discussion between Mr. Narrow and Mr. Fenti on September 2,1977.

Areas examined during this inspection are describe Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with l etter.

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed.in the NRC's Public Document T.f this recort contains any infonnation that you (or your con-written application within 20 days to this' office to withh Room.

Any such application must be acccm-

-information from public disclosure.

panied by an affidavit executed by the owner of the i a statement of reasons which addresses with specificity the items which will be considered by the Commission as listed in subpa If we do not Section 2.790.

as far as possible into a separate part of the affidavit.

e m

b

~

^

~

n os 0 442 Qqtm

2 Metropolitan Edison Company hear from you in this regard within the specified period, the report will be placed in the Public Document Room.

No reply to this letter is required; however, should you have any questio concerning this inspection, we will be pleased to discuss them with you.

Sincerely, kfd f. NM

' Robert T. Carlson, Chief Reactor Construction and Engineering Support Branch Office of Inspection and Enforcement Inspection Report

Enclosure:

Number 50-320/77-35 cc w/ encl:

R. L. Wayne, QA Manager, Design and Construction T. M. Crimmins, Jr., Safety & Licensing Manager G. P. Miller, Superintendent R. W. Heward, Jr., Project Manager R. C. Arnold, Vice President, Design & Construction Gerald Charnoff Esquire Miss Mary V. Southard, Chairman Citizens for a Safe Environment (Without Report)

W

...-