ML19220B746
| ML19220B746 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 11/10/1971 |
| From: | Howard E US ATOMIC ENERGY COMMISSION (AEC) |
| To: | James O'Reilly METROPOLITAN EDISON CO. |
| Shared Package | |
| ML19220B747 | List: |
| References | |
| NUDOCS 7904270291 | |
| Download: ML19220B746 (1) | |
Text
.
.4 UNITED ST AT'.5
,c M,V
- 2.x ATOMIC ENERGY COMMISSION
/ ' '*)
olvisioN OF L O Mf'L. A Ncc 201 G45 5'(,
l RLCION i
',;, lf
. []
970 DROAD STRccT g #'
NcWARK. NEW JEREcY 071C0
,. ~ ~-
..ngg 3
- y 61 U,
A J. P. O'Reilly, Chief, Reactor Inspection and Enforcenent branch, Division of Compliance, HQ METROIOLIT A', EDISCS CCMTA';Y (THEEE MILE IFL/C:D C';IT 1:0. 2)
Docket 50. 50-320 Tne attacntd report of the inspection of tne Metropolitan Edison, Three Mile Island Unit 50. 2 construction site, conducted on October 6 and 9, 1970 is forwarded for infor=ation.
The inspection consisted of a review of procurement documents for reactor presst re toundary piping, other Class I piping, and eieetrical and instrumenta-tion cables. No items of nonconformance were identified; however, the pro-
- ification for the piping failed to specify hydrostatic testing cure =ent si the place of manufacture and the qualification requirements of standards atfor the ND* technicians. The items are under revica by the licensee and will be reinspected.
f
- o. Yf/ 3YawatU E. M. Howard Senior Reactor Inspector
Enclosure:
CO Rpt. No. 320/70-6, by D. Hunnicutt dated 11/6/70.
cc:
E. J. Case, DRS (3)
P. A. Morris, DRL R. S. Boyd, DEL (2)
R. C. DeYoung, DRL (2)
D. J. Skovholt, DRL (3)
P. W. Howe, DRL (2)
A. Giambusso, CO L. Kornblith, Jr., CO R. H. Engelken, CO Regional Directors, CO REG Files /
7904270291
\\
SM 'i D 82~02G i
_