ML19220B437
| ML19220B437 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 08/23/1977 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Herbein J METROPOLITAN EDISON CO. |
| Shared Package | |
| ML19220B435 | List: |
| References | |
| NUDOCS 7904260095 | |
| Download: ML19220B437 (2) | |
See also: IR 05000320/1977029
Text
f
N,
f
.. ':.
NUCLEAR REGULATORY COMMiss!ON
[ ,Q'sj 5
REGION I
e '$
.-
r
631 PARM AVENUE
I
MtNC OF P R US SI A. PF.N N S Y L.V A NI A 19406
-#
t,
- q
-
- ,..=
Docket No. 50-320
AUG 2 31977
I>etropolitan Edison Company
ATTN:
Mr. J. G. Herbein
Vice Presiden
P. O. Box 542
Reading, Pennsylvania 19603
Gentlemen:
Subject:
Inspection 50-320/77-29
This refers to the inspection conducted by Mr. T. Rebelowski of this
office on July 20-22, 26-28, 1977, at Three Mile Island, Unit 2, Middletown,
Pennsylvania, of activities authorized by NRC License ho. CPPR-66 and to
the discussions of our findings held by Messrs. Rebelowski and L. Sjostrom
with Messrs. Toole and Hillbish of your staff at the conclusion of the
insoection, and to a subsequent telephone discussion between Mr. Rebelowski
and Mr. Toole on August 4,1977.
Areas examined during this inspection are described in the Office of
Inspection and Enforcement Inspection Report which is enclosed with this
letter. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Based on the results of this inspection, it appears that one of your
activities was not conducted in full compliance with NRC requirements,
as set forth in the Notice of Violation, enclosed herewith as Appendix
A.
This item of noncompliance has been categorized into the levels as
described in our correspondence to you dated December 31, 1974. This
nutice is sent to you pursuant to the provisions of Section 2.201 of the
NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this office, within twenty (20)
days of your receipt of this notice, a written statement or explanation
in reply including:
(1) corrective steps which have been taken by you
and the results achieved; (2) corrective steps which will be taken to
avoid further items of noncompliance; and (3) the date when full com-
-
pliance will be achieved.
.
.,
L
_
7 9 0 4 2 6 0 C9 6
_
_.
.
.. . . - -
2
AUG 2 31977
Metropolitan Edison Company
In accorcance with Section 2.790 of the tiRC's " Ru
If this
enclosures will be placed in the NRC's Public Document Rocm.
recort contains any information that you (or your contractor) believe to
be prcprietary, it is necessary that you make a written application
blic
within 20 days to this office to withhold such information fr
executed by the owner of the information, which icentifies the document
cisclosure.
or part sought to be withheld, and which contains a statement of reasons
idered by
which addresses with specificity the items which will be cons
The
the Cc:r.issicn as listed in subparagraph (b)(4) of Sec
If we do not hear from you in
into a separate part of the affidavit.this regard within the specifie
the Public Document Rotm.
Should you have any questions concerning this inspection, we will be
pleased to discuss them with you.
Sincerely.
-w
on F. Brunner, Chief
E}ictor Operations and Nuclear Suppor:
Re'
Branch
Enclosures:
Appendix A, Notice of ViolationOffice of Inspection and Enforce
1.
2.
Number 50-320/77-7.9
cc w/ enc 1:
R. L. Wayr.e, QA Manager, Design & Construction
T. M. Crimins, Jr., Safety & Licensing Manager
R. W. Heward, Jr., Project Manager
R. C. Arnold, Vice President, Design & Construction
L. L. Lawyer, Manager, Generation Operations - Nuclear
G. P. Miller, Superintendent
J. L Seelinger, Unit 2 Superintendent
Gerald Charnoff, Esquire
Miss Mary V. Southard, Chaiman, Citizens for a Safe Environment
(Without Report)
77073
_
f
'
i