ML19220B400
| ML19220B400 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 08/18/1976 |
| From: | Robert Carlson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Arnold R METROPOLITAN EDISON CO. |
| Shared Package | |
| ML19220B401 | List: |
| References | |
| NUDOCS 7904250692 | |
| Download: ML19220B400 (2) | |
See also: IR 05000320/1976009
Text
l -'
.
- ""W,
UNt1 E D STATES
-
(,
,\\
NUCLEAR R L G U LATO R Y CO r.1MISS10 N
-
([ k
ntctoN I
'
,
..
%
, e
C31 PARK AVENUF
,-
' -
4
M f4G OF Pf
3%l A, PE Nf4 5 V LV/\\NI A 19406
-
's. ,
'***
f,'J518 075
Metropolitan Edison Company
License No. CPPR-66
Attention:
Mr. R. C. Arnold
Inspection No. 76-09
Vice President
Docket No. 50-320
P. O. Box 542
Reading, Pennsylvania 19603
Gentlemen:
This refers to the inspection conducted by Mr. L. Narrow of this office
on August 3-6, 1976 at Middletown, Pennsylvania, of activities authorized
by SRC Li cense 'lo. CPPR-66 cnd to the discussions of our findings held
by Mr. Narrow wtth Mr. Levin and other members of your staff at the
conclusion of the inspection.
Areas examined during this inspection are described in the Office of
Inspection and Enforcement Inspection Report which is encloced with this
letter. Within these areas, the irspectica consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncennliance were
observed.
In accordance with Section 2.790 of the URC's "Rr.ics of Prac.tice", Part
2, Titla 10, Code of Federal Regulations, a ecpy of this letter ana the
enclosed inspection report will be placed 1. the NRC's Public D cument
Room.
If this report contains any informat Jon that you (or your con: Tactor)
believe. to be proprietary, it is necessary *. hat you make a written
application within 20 days to this of fice to withhold such infor:ation
from public disclosure. Any such applic-il
=ust be accompanied by an
affidavit executed by the owner of the inforgation, which identifies the
document or part sought to be withheld, and which contains a statement
of reasons which addresses with specificity the items which will be
considered by the Co=11ssion as listed " a subparagraph (b) (4) of Scction
2.790.
The information sought to be v4.thheld shall be incorporated as
far as possible into a separate part of the affidavit.
If we do not
hear from you in this regard within the specified period, the report
will be placed in the Public Document Room.
.
m
7 9 0d er, y p ,
',3j3OS
-
-
,
U
-
l
.
.
-
--
,
_2_
.
No reply to this letter is required; however, should you have any
.
questions concerning this inspection, we will be pleased to discuss
them with you.
Sincerely,
.
h{,
./n
/
pt
-
.ubert T. Carlson, Chief
Reactor Construction and Engineering
Support Branch
Enclosure:
IE Inspection Report No. 50-320/76-09
cc:
R. L. Wayne, QA Manager, Design and Construction
T. M. Cricains, Jr., Safety & Licensing Manager
R. W. Heward, Jr. , Proj ect Manager
W. A. Verrochi, Vice President, Design & Ccastruction
Gerald Charnoff, Esquire
Miss Mary V. Southard, Chairman Citizens for a Safe Enviren=cnt
(Without Report)
.
~
- O
-
.
.,a
--
~
!
.
~
k