ML19220B342
| ML19220B342 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 04/19/1973 |
| From: | Howard E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | John Miller METROPOLITAN EDISON CO. |
| Shared Package | |
| ML19220B343 | List: |
| References | |
| NUDOCS 7904250653 | |
| Download: ML19220B342 (2) | |
See also: IR 05000320/1973001
Text
P
.
l;/ (
(u i
.
\\
.x
-
_
!
t
.
.
.
-
-
.
I
!
APn i 91973
>
-
\\
1
.
,
Docket No. 50-320
Metropolitan Edison Cenpany
j
Att ention : lir. J. G. !! iller,
Vice President
!
P.O. I,ox 542
j
Reading, Tennsylvanin 19603
,
!
'
Centic::en :
This refers to the inspection conducted by Mr. Varela of this office on
11 arch 14-16,1973 cf activitics authorized by AEC Construction Per=it
g
!!o. CPFR-66 and to the discussions of our findings held by Mr. Varels
with Mr. Stror. berg and Mr. Shephe. d of your staff at the conclusion of
-
the inspection.
.
Arcas nnnined during this inspection are described in the Rcrulatory
Within
Operations Inspectien Report stich is enclosed with this letter.
the inscection consisted of selective exaninatiens of pro-
these areas ,
cedures and reprecentative records, interviews with plant personnel, and
observations by the inspector.
Within the scope of this inspection, no violations or safety ite=s were
.
observed.
In accordance with Section 2.790 of the AEC's " Rules of Practice," Part
2, Iitle 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspecticn report vill be placed in the AEC's Public Document
Room. If this report contains any infor: stion that you (or your con-
tractor) believe to be proprietary, it is necessary that you make a
written application within 20 days to this office to vithhold such in-
for=ation from public disclosure. Any such application ::ust include a
full statc=cnt of the reasons on the basis of thich it is claimed that
the inferr.ation is proprietary, and should be prepared so that proprie-
tary informatien identified in the application is contained in a sep-
arate part of the docunent. If we do not hear from you in this reFard
within the specified period, the report vill be placed in the Public
Docu= cut Room.
.
_
i
('
CRESS I
5 D" N1
gf
'
Varela:dv
Tillon
Howard
l
-
4-13-73
l.
79042b0453
c o.
_
, ._
i
.
.
g
.'
.
-
>
-
.
I
-
-
,
-
-
I
'
Should you hava any .cuestiona conccrr.in3 this inspection, we vill be
, pleased to discuss them with ytxt.
,
Sincerely,
I
\\
.
'
I
E. Morris 11cuard, Chief
Facility Construction end
Engineering Eupport Branch
Enclosure:
RO Inspection Report F.o. 50-320/73-01
ces
R. W. Ecuard, Jr. , Project }!anaScr, CPU
_
T. M. Crinnins, Jr. , Csfety and Licensing Nanager, GPU
W. A. Verrochi, Vice President, GFU
G. Charnoff, Esquire, Chr.t, Pitt=an, Potts and Trowbridge
R. Klingercan, Plant supt, THI
bec: RO Ch, Reactor Construction Br, HQ
RO:HQ (4)
Directorate of Licensing, EQ (4)
RO Directors
'
v"IR Central Files
Local PDR
USIC
-
State af Pennsylvania
.
-
<
. y 182
-
,
'l
i