ML19220B342

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-320/73-01 on 730314-16
ML19220B342
Person / Time
Site: Crane 
Issue date: 04/19/1973
From: Howard E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: John Miller
METROPOLITAN EDISON CO.
Shared Package
ML19220B343 List:
References
NUDOCS 7904250653
Download: ML19220B342 (2)


See also: IR 05000320/1973001

Text

P

.

l;/ (

(u i

.

\\

.x

-

_

!

t

.

.

.

-

-

.

I

!

APn i 91973

>

-

\\

1

.

,

Docket No. 50-320

Metropolitan Edison Cenpany

j

Att ention : lir. J. G. !! iller,

Vice President

!

P.O. I,ox 542

j

Reading, Tennsylvanin 19603

,

!

'

Centic::en :

This refers to the inspection conducted by Mr. Varela of this office on

11 arch 14-16,1973 cf activitics authorized by AEC Construction Per=it

g

!!o. CPFR-66 and to the discussions of our findings held by Mr. Varels

with Mr. Stror. berg and Mr. Shephe. d of your staff at the conclusion of

-

the inspection.

.

Arcas nnnined during this inspection are described in the Rcrulatory

Within

Operations Inspectien Report stich is enclosed with this letter.

the inscection consisted of selective exaninatiens of pro-

these areas ,

cedures and reprecentative records, interviews with plant personnel, and

observations by the inspector.

Within the scope of this inspection, no violations or safety ite=s were

.

observed.

In accordance with Section 2.790 of the AEC's " Rules of Practice," Part

2, Iitle 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspecticn report vill be placed in the AEC's Public Document

Room. If this report contains any infor: stion that you (or your con-

tractor) believe to be proprietary, it is necessary that you make a

written application within 20 days to this office to vithhold such in-

for=ation from public disclosure. Any such application ::ust include a

full statc=cnt of the reasons on the basis of thich it is claimed that

the inferr.ation is proprietary, and should be prepared so that proprie-

tary informatien identified in the application is contained in a sep-

arate part of the docunent. If we do not hear from you in this reFard

within the specified period, the report vill be placed in the Public

Docu= cut Room.

.

_

i

('

CRESS I

5 D" N1

gf

'

Varela:dv

Tillon

Howard

l

-

4-13-73

l.

79042b0453

c o.

_

, ._

i

.

.

g

.'

.

-

>

-

.

I

-

-

,

-

-

I

'

Should you hava any .cuestiona conccrr.in3 this inspection, we vill be

, pleased to discuss them with ytxt.

,

Sincerely,

I

\\

.

'

I

E. Morris 11cuard, Chief

Facility Construction end

Engineering Eupport Branch

Enclosure:

RO Inspection Report F.o. 50-320/73-01

ces

R. W. Ecuard, Jr. , Project }!anaScr, CPU

_

T. M. Crinnins, Jr. , Csfety and Licensing Nanager, GPU

W. A. Verrochi, Vice President, GFU

G. Charnoff, Esquire, Chr.t, Pitt=an, Potts and Trowbridge

R. Klingercan, Plant supt, THI

bec: RO Ch, Reactor Construction Br, HQ

RO:HQ (4)

Directorate of Licensing, EQ (4)

RO Directors

'

v"IR Central Files

PDR

Local PDR

USIC

-

TIC

State af Pennsylvania

.

-

<

. y 182

-

,

'l

i