ML19220A930
| ML19220A930 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 09/11/1975 |
| From: | Robert Carlson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Arnold R METROPOLITAN EDISON CO. |
| Shared Package | |
| ML19220A931 | List: |
| References | |
| NUDOCS 7904250104 | |
| Download: ML19220A930 (2) | |
See also: IR 05000320/1975011
Text
e
2
l
,
UNIT ED S1ATTL
~
'N
-
,
~
- /
Y//
.. ctran ntautuoav co=ISSION
[
R[GION '
M
'
s
s3s cann Av[ tau [
nerac or enussa A, PL NrdsvLvaNi A 19406
g{p
y
,
Metropolitan Edison Company
License No. CPPR-66
Attention:
Mr. R. C. Arnold
Inspection 75-11
-
Vice President
Docket No. 50-320
~
P.O. Box 542
.
Reading, Pennsylvania 19603
Gentle =en :
.
This refers to the inspection conducted by Mr. L. Narrow of this office
on August 27-29, 1975 at Middletown, Pennsylvania of activitics author-
ized by NRC License No. CPPR.66 and to the discussions of our findings
held by Mr. L. Narrow with Mr. Cunn and other members of your staff at
the conclusion of the inspection.
Areas examined during this inspection are described in the Office of
Inspection and Enforcement Inspection Report which is enclosed with this
letter. L'ithin these areas, the inspection consisted of selective exam-
inations of procedures and representative records, interviews with
personeel, and observations by the inspector.
Based on the results of this inspection, it appears that one of your
activitics was not conducted in full compliance uith NRC requirc=ents,
as set forth in the Notice of Violation, enclosed hercuith as Appendix
A.
This item of nonco=pliance has been categorized into the levels as
'
described in our correspondence to you dated Dece=ber 31, 1974.
This
notice is sent to you pursuant to the provisions of Section 2.201 of the
NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations.
Section 2.2u1 requires you to submit to this of fice, within twenty (20)
days of your receipt
-
his notice, a written statement or explanation
in reply including:
(1; corrective steps which have been taken by you
and the results achie ~d; (2) corrective steps which will be taken to
avoid further items of noncompliance; and (3) the date when full com-
pliance vill be achieved.
.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosures vill be placed in the NRC's Public Document Room.. If this
report contains any information that you (or your contractor) believe to
be proprietary, it is necessary that you make a written applicition
within 20 days to this office to withhold such information from pu'alic
disclosure. Any such application must include a full state =ent of the
reasons on the basis of which it is claimed that the information is
b
. ien
G%3/
%)
.
m.s
. . .
.
f
/&7
-
7 90425 0'07 " W ,hs
~
W CM
-
-
Metropolitan T.dison (,ompany
.
-2-
-
propri'.tary, and shouli be prepared so that proprietarv information
_*
identAfied in the application is contained in a separate part of the
docu .:ent.
If we do not hear from you in this regard within the speci-
-
'
f~cd period, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we vill be
-
pleased to discuss them with you.
Sincerely,
,
f$-
5
~
Robert T. Carlson, Chief
Facility Construction and Engineering,
Support Eranch
Enclosures:
1.
Appendix A, Kotice of Violation
2.
IE:I Inspection Report No. 50-320/75-11
R. L. Wayne , QA Manager , Design and Construction
cc:
T. M. Cri== ins, Jr. , Saf ety & Licensing Manager
'
R. W. Heward, Jr. , Project Manager
W. A. Verrochi, Vice President, Design & Construction
Gerald Charnoff, Esquire
bec: (W/encls)
IE Chief, FSEEB
.
IE:HQ (5)
DL (4 w/encls, plus 9 cys report only)
DR Central Files
~ --
RS (3)
Local PDR
-
IE Files
RSIC
REG:I Reading Room
Miss Mary V. Southard, Chairman Citizens for a
Safe Environner.t
State of Pennsylvania
ELD
~
.
L
i
-
i
-
1
-
qg-Ky
4