ML19220A511

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-320/77-40 on 771004-06 & 10-14. No Noncompliance Noted
ML19220A511
Person / Time
Site: Crane Constellation icon.png
Issue date: 11/07/1977
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Herbein J
METROPOLITAN EDISON CO.
Shared Package
ML19220A516 List:
References
NUDOCS 7904230040
Download: ML19220A511 (2)


See also: IR 05000320/1977040

Text

.

.

MS

)

C Cn Ti:.n

UNITED ST ATES

p" "' %e

NUCLEAR REGULATORY COMMISSION

g\\

y

,

REGION I

e([ $

-'

'.g/;.,,,' /,,f

KING OF PRUSSI A. PENNSYl V ANS A

631 PARK AVENUC

19406

'N

-

,

% -:"/;;

G %i

.,%

NOV 7

1977

""

Docket No. 50-320

Metropolitan Edison Company

ATTN: Mr. J. G. Herbein

Vice President

P. O. Box 542

19603

Reading, Pennsylvania

Gentlemen:

Subject: Inspection 50-320/77-40

This refers to the inspection conducted by Mr. P. Kellogg of this o

on October 4-6, 10-14, 1977,

of activities authorized by NRC License No. CPPR-6

conclusion of the in:pection.

Areas examined during this inspection are described

Within these areas, tne inspection consisted of selective

examinations of procedures and representative records, interviews with

letter.

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

_

enclosed inspection report will be placed in the NRC's Public Document

If this report contains any information that you (or your con-

written application within 20 days to this office to withho

Room.

Any such application must be

information from public disclosure.

accompanied by an affidavit executed by the owner of the information,

which identifies the document or part sought to be withheld, and

which contains a statement of reasons which addresses with specificity

the items which will be considered by the Commission as listed in

L

G3 202

!

1

b

$2kb

g _tp

0,

.

.

L

-

Metropolitan Edison Co.

2

NOV 7

1977

subparagraph (~ )(4) of Section 2.790.

The information sought to be

c

withheld shall be incorpurated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard

within the specified period, the report will be placed in the Public

Document Room.

lb reply to this letter i: required; however, if you should have any

questions concerning this inspection, we will be pleased to discuss

them with you.

Sincerely,

El o . J. Brunner, Chief

Reactor Operations and Nuclear

Support Branch

Enclosure: Office of Inspection and Enforcement Inspection

Report Number 50-320/77-40

cc w/ encl:

R. L. Wayne, QA Manager, Design & Construction

T. Broughton, Safety & Licensing Manager

R. W. Heward, Jr., Project Manager

R. C. Arnold, Vice President, Generation

L. L. Lawyer, Manager, Generation Operations - Nuclear

G. P. Miller, Superintendent

J. L. Seelinger, Unit 2 Superintendent

Gerald Charnoff, Esquire

Miss Mary V. Southard, Chairman, Citizens for a Safe Environment .

-

(Without Report)

.

t

G5~203