Forwards IE Insp Rept 50-348/79-36 on 791105-09 & Notice of Violation
ML19211D240
Person / Time
Site: Farley 
Issue date: 12/03/1979
From: Sutherland J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Clayton F
ALABAMA POWER CO.
Shared Package
ML19211D241 List:
References
NUDOCS 8001170279
Download: ML19211D240 (2)


See also: IR 05000348/1979036

Text

k

,

[pn neat,.*o

UNITED STATES

do-8Y $

+

8

g

NUCLEAR REGULATORY COMMISSION

o

'

i

i

REGION 11

o,

101 MARIETTA ST

N.W., SUITE 3100

%

ATLANTA. GEORGIA 3o3o3

In Reply Refer To:

DEC 0 31979

RII:DJP

50-348/79-36

Alabama Power Company

ATTN:

F. L. Clayton, Jr.

Senior Vice President

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

This refers to the inspection conducted by P. A.

Taylor of this office on

November 5-16, 1979, of activities authorized by NRC License No. NPF-2 for the

Farley Nuclear Station facility, and to the discussion of our findings held with

W. G. Hairston at the conclusion of the inspection.

4

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

During the inspection it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. This item and references

to pertinent requirements are listed in the Notice of Violation enclosed herewith

as Appendix A.

Corrective actions to prevent recurrence were completed prior to

the conclusion of this inspection; therefore, a reply is not requested.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

_

1762 079

~

8001170 z71

DEC 0 31979

.

Alabama Power Company

-2-

.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

el

%'

ab

J. T. Sutherland, Chief

Fuel Facility and Materials

Safety Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-348/79-36

cc w/ encl:

A. R. Barton

Executive Vice President

P. O. Box 2641

Birmingham, AL 35291

J. T. Young

Vice President-Production

Post Office Box 2614

Birmingham, Alabama 35291

H. O. Thrash

Manager-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

C. Biddinger, Jr.

Manager-Corporate Quality Assurance

P. O. Box 2641

Birmingham, AL 35291

W. G. Hairston, III

Plant Manager

Drawer 470

Ashford, AL 36312

R. E. Hollands, Jr.

QA Supervisor

P. O. Box U

Ashf6Fa, AL 36312