k
,
[pn neat,.*o
UNITED STATES
do-8Y $
+
8
g
NUCLEAR REGULATORY COMMISSION
o
'
i
i
REGION 11
o,
101 MARIETTA ST
N.W., SUITE 3100
%
ATLANTA. GEORGIA 3o3o3
In Reply Refer To:
DEC 0 31979
RII:DJP
50-348/79-36
Alabama Power Company
ATTN:
F. L. Clayton, Jr.
Senior Vice President
P. O. Box 2641
Birmingham, AL 35291
Gentlemen:
This refers to the inspection conducted by P. A.
Taylor of this office on
November 5-16, 1979, of activities authorized by NRC License No. NPF-2 for the
Farley Nuclear Station facility, and to the discussion of our findings held with
W. G. Hairston at the conclusion of the inspection.
4
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
During the inspection it was found that certain activities under your license
appear to be in noncompliance with NRC requirements. This item and references
to pertinent requirements are listed in the Notice of Violation enclosed herewith
as Appendix A.
Corrective actions to prevent recurrence were completed prior to
the conclusion of this inspection; therefore, a reply is not requested.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary
information identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
_
1762 079
~
8001170 z71
DEC 0 31979
.
Alabama Power Company
-2-
.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
el
%'
ab
J. T. Sutherland, Chief
Fuel Facility and Materials
Safety Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report No. 50-348/79-36
cc w/ encl:
A. R. Barton
Executive Vice President
P. O. Box 2641
Birmingham, AL 35291
J. T. Young
Vice President-Production
Post Office Box 2614
Birmingham, Alabama 35291
H. O. Thrash
Manager-Nuclear Generation
P. O. Box 2641
Birmingham, AL 35291
C. Biddinger, Jr.
Manager-Corporate Quality Assurance
P. O. Box 2641
Birmingham, AL 35291
W. G. Hairston, III
Plant Manager
Drawer 470
Ashford, AL 36312
R. E. Hollands, Jr.
QA Supervisor
P. O. Box U
Ashf6Fa, AL 36312
1762.080