Forwards IE Insp Repts 50-440/79-10 & 50-441/79-10 on 791016-18 & Notice of Violation
ML19211D225
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 11/21/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML19211D227 List:
References
NUDOCS 8001170133
Download: ML19211D225 (2)


See also: IR 05000440/1979010

Text

b

[ . .%

,

o

UNITED STATES

E\\

'

NUCLEAR REGULATORY COMMISSION

'

n

5 - (, ",'

$

REGION 111

  • d'F

o

8

799 ROOSEVELT ROAD

E

GLEN E LLYN, ILLINols 60137

%s

  • ...+

NOV 211979

Docket No. 50-440

Docket No. 50-441

The Cleveland Electric Illuminating

Company

ATTN:

Mr. D. R. Davidson

Vice President

System Engineering

and Construction

Post Office Box 5000

Cleveland, OH 44101

Gentlemen:

This refers to the inspection conducted by Messrs. J. E. Konklin,

K. R. Naidu, G. F. Maxwell, and J. F. Suermann of this office on

October 16-18, 1979, of activities at the Perry Nuclear Plant Project,

Units 1 and 2, authorized by NRC Construction Permits No. CPPR-148 and

No. CPPR-149 and to the discussion of our findings with Messrs. M. R. Edelman

and G. W. Groscur and others of your staff at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted of a

selective examination of procedures and representative records, observa-

tions, and interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as described in the enclosed Appendix A.

This notice is sent to you pursuant to the provisions of Section 2.201 of

the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office within thirty days of

your receipt of this notice a written statement or explanation in reply,

including for each item of noncompliance: (1) corrective action taken and

the results achieved; (2) corrective action to be taken to avoid further

noncompliance; and (3) the date when full compliance will be achieved.

1762 045

i

8 0 01170 /M

.

The Cleveland Electric

-2-

NOV 211979

Illuminating Company

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this

letter, the enclosures, and your response ta this letter will be

placed in the NRC's Public Document Room., except as follows.

If

the enclosures contain information that you or your contractors

believe to be proprietary, you must apply in writing to this office,

within twenty days of your receipt of this letter, to withhold such

information from public disclosure. The application must include a

full statement of the reasons for which the information is considered

proprietary, and should be prepared so that proprietary information

identified in the application is contained in an enclosure to the

application.

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

[

Nw

mw

l

Gaston Fiorelli, Chief

[et Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice of

Violation

2.

IE Inspection Reperts

No. 50-440/79-10 and

No. 50-441/79-10

cc w/encls:

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Harold W. Kohn, Ohio Power

Siting Commission

Mr. Daniel D. Wilt, Attorney

1762

046