Forwards IE Insp Repts 50-269/79-30,50-270/79-28 & 50-287/79-30 on 791029-1102.No Noncompliance Noted
ML19211D181
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 12/03/1979
From: Sutherland J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19211D182 List:
References
NUDOCS 8001170001
Download: ML19211D181 (2)


See also: IR 05000269/1979030

Text

-T~~c

.

/

'o

UNITED STATES

do-667

8

g

NUCLEAR REGULATORY COMMISSION

87<>

o

y

REGION 11

g7

.

g<s.

g

101 MARlETTA ST

N.W., SUITE 3100

o

e

ATLANTA, GEORGIA 3o3o3

In Reply Refer To:

RII:TCM

50-269/79-30

DEC 0 31979

50-270/79-28

50-287/79-30

Duke Power Company

ATTN:

W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

Charlotte, NC 28242

Gentlemen:

This refers to the inspection conducted by T. C. MacArthur of this office on

October 29 to November 2,1979, of activities authorized by NRC Operating License

Nos. DPR-38, DPR-47 and DPR-55 for the Oconee Nuclear Station facility, and to

the discussion of our findings held with J. E. Smith at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspectica

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such applicatior, must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specif.ied period,

the report will be placed in the Public Document Room.

-

. . ,*-

M,

.

U61

226

8 001170 CD \\

.

DEC 0 31979

Duke Power Company

-2-

.

Should you have ony questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

(th

dek

'

-

J. T. Sutherland, Chief

Fuel Facility and Materials

Safety Branch

Enclosure:

Inspection Report Nos. 50-269/79-30,

50-270/79-28 and 50-287/79-30

cc w/ encl:

J. E. Smith, Station Manager

P. O. Box 1175

Seneca, SC 29678

.