Notice of Violation from Insp on 791013-1109
ML19211C988
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 12/06/1979
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19211C967 List:
References
50-395-79-37, NUDOCS 8001160074
Download: ML19211C988 (1)


Text

.

APPENDIX A NOTICE OF VIOLATION South Carolina Electric and Gas Company License No. CPPR-94 V. C. Summer Based on the NRC inspection October 13 - November 9,1979, certain of your activities were apparently not conducted in full compliance with NRC require-ments as indicated below. These items have been categorized as described in correspondence to you dated December 31, 1974.

As required by 10 CFR 50 Appendix B, Criterion V, as implemented by Section 4.6 of the Construction Quality Assurance Plan, documented procedures shall be followed for the preoperational test program.

Step 5.10 of procedure RC-01-H-1, Reactor Coolant System Cold Hydro Test requires that Reactor Coolant System heatup rate not exceed 50 F per hour.

Step 5.3 of procedure RC-01-H-1 requires 150*F maximum system temperature for the test as read on loop RTDs in service.

Contrary to the above, on November 2, 1979, during conduct of the a.

Reactor Coolant System Cold Hydro 'fest, per procedure RC-01-H-1, the Reactor Coolant System was heated up 55 F in one hour as indicated by loop RTDs.

b.

Contrary to the above, on November 2, 1979, during conduct of the subject test, system temperature as read en the loop RTD indicated a temperature of 155 F.

This is an infraction.