Forwards IE Insp Rept 50-395/79-37 on 791013-1109 & Notice of Violation
ML19211C986
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 12/07/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Nichols T
SOUTH CAROLINA ELECTRIC & GAS CO.
Shared Package
ML19211C967 List:
References
NUDOCS 8001160070
Download: ML19211C986 (2)


See also: IR 05000395/1979037

Text

.

.

.

'

fn neo

'o

UNITED STATES

8

  • 1

NUCLEAR REGULATORY COMMISSION

$

E

REGION 11

%*****j['

101 MARIETTA ST

N.W., SUITE 3100

o,

'

ATLANTA, GEORotA 303o3

DEC 0 71979

In Reply Refer To:

RII:JLS

50-395/79-37

South Carolina Electric and Gas Company

ATTN:

T. C. Nichols, Jr. , Vice President

Power Production and Systems Operations

P. O. Box 764

Columbia, S C 29218

Gentlemen:

This refers to the inspection conducted by J. L. Skolds of this office on

October 13 - November 9,1979, of activities authorized by NRC Construction

Permit No. CPPR-94 for the V. C. Summer facility, and to the discussion of our

findings held with 0. S. Bradham at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinatiocs of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. This item and references

to pertinent requirements are listed in the Notice of Violation enclosed herewith

as Appendix A.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-

tions. Section 2.201 requires you to submit to this office, within 20 days of

your receipt of this notice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you and the results achieved; (2)

corrective steps which will be taken to avoid further noncompliance; and (3) the

date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is_ claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

1756

151

8001100070

.

.

.

South Carolina Electric and Gas

-2-

Company

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

M c ls.- p

R. C. Lewis, Acting Chief

Reactor Operation and Nuclear

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-395/79-37

cc w/ enc 1:

A. A. Smith

Quality Assurance

P. O. Box 8

Jenkinsville, S C 29065

T. B. Conners, Jr.

Corners, Moore and Corber

1747 Pennsylvania Avenue, N.W.

Washington, D C 20006

0. S. Bradham, Manager

Nuclear Operations

P. O. Box 8

Jenkinsville, S C 29065

1756