ML19211C641
Jump to navigation
Jump to search
| ML19211C641 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 12/27/1979 |
| From: | Spencer G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Arenal A SOUTHERN CALIFORNIA EDISON CO. |
| Shared Package | |
| ML19211C642 | List: |
| References | |
| NUDOCS 8001140093 | |
| Download: ML19211C641 (1) | |
Text
a' *n.oi,h o
pq V UNITED STATES y
y y, ' '. 'g NUCLEAR REGULATORY COMMISSION t
REGION V
'g 4
[
1990 N. CALIFORNIA ItOULEVARD
'%.[o 0, *,
U SUITE 202, WALNUT CHEEK PLAZA e eg,e WALNUT CRE E K, Calli DRNI A 94596 December 27, 1979 Southern California Edison Company P.O. Fox 800 2244 Walnut Grove Avenue Rosemead, California 91770 Attention: Mr. A. Arenal Vice President Gentlemen:
Subject:
NRC Inspection Report No. 50-361/79-26 Attached is a revised Appendix A to NRC Inspection Report No. 50-361/79-26 for San Onofre Unit 2.
Please replace the Appendix A page of your copy of the subject report with this revised Appendix A.
Sincerely, G.S.Sp(encer, Chief Reactor Construction and Engineering Support Branch
Attachment:
As stated 1743 222 8001140 0 %